Construction of Jiangxi Copper, Lead and Zinc Metal Co., Ltd.

Jiangxi Copper-Lead-Zinc Metal Co., Ltd. was built in two phases, and the final production scale was 400,000 tons of lead and zinc, which was listed as a key construction project in Jiangxi Province. The first phase of the project started in June 2009 in Jinshawan Industrial Park, Hukou County, Jiangxi Province. It is estimated that the ignition temperature will rise by 20 1 1 in July, and the annual production capacity of lead and zinc will be 200,000 tons.