What are the management systems, specific measures, specific assessment methods and implementation rules for energy conservation and emission reduction?
1 Purpose \x0d\ Strengthen energy management, make scientific and rational use of water, electricity, coal, oil and other resources, and reduce resource waste; In order to reduce the cost and improve the overall economic benefit of the unit, this regulation is formulated. \x0d\ 2 Scope of application \x0d\ These Provisions are applicable to the energy consumption management of water, electricity, coal, oil and other resources in administrative organs and units. \x0d\ 3 Responsibilities \x0d\ 3. 1 The office is responsible for formulating the consumption reduction index plan, establishing the energy saving and consumption reduction account, and organizing internal inspection and assessment. \x0d\ 3.2 Each unit is responsible for implementing water-saving, electricity-saving, coal-saving and oil-saving rectification measures and energy-saving and consumption-reducing indicators, and reporting energy-saving and consumption-reducing reports to the office. \x0d\ 4 working procedures \x0d\ 4. 1 water-saving management measures \x0d\ 4. 1. 1 the office formulates the water use plan of the management office according to the water use indicators issued by the municipal water-saving office. \x0d\ 4. 1.2 The application for new or developed water for the project shall be submitted by the office to the competent leader of the management office for approval. \x0d\ 4. 1.3 Part-time personnel are responsible for the inspection and maintenance of water pipelines on the construction site to reduce the waste of running, running, dripping and leaking. \x0d\ 4. 1.4 All units should gradually implement water meter measurement according to the actual situation of residents to reduce the waste of water resources. \x0d\ 4.2 Power-saving management measures \x0d\ 4.2. 1 The construction party shall designate a special person to be responsible for the meter reading and measurement of electricity consumption at each construction site. \x0d\ 4.2.2 There must be professionals in charge of the power distribution room in all power consumption places, improve the post responsibility system, fill in the operation records carefully, and be responsible for the power supply quality and safe power consumption. \x0d\ 4.2.3 The power load of office buildings and conference rooms should be controlled by separate switches. The person in charge of electricity consumption in the above places should always check the power saving situation when people leave the machine and stop, and the lights will go out when people leave. \x0d\ 4.2.4 When updating equipment, all departments of the management office should consider eliminating electromechanical equipment with high energy consumption, and strive to replace and use new energy-saving technical products. \x0d\ 4.2.5 It is forbidden to connect electric appliances such as electric furnaces without permission. \x0d\ 4.3 Coal saving management measures \x0d\ 4.3. 1 Improve the boiler room system and encourage coal saving. \x0d\ 4.3.2 Overhaul the boiler frequently to maintain good operation. \x0d\ 4.3.3 Improve fireman's operation technology, improve combustion efficiency and save coal consumption on the basis of ensuring supply. \x0d\ 4.4 Fuel-saving management measures \x0d\ 4.4. 1 Further improve the vehicle management system of the management office and put an end to the phenomenon of private cars running. \x0d\ 4.4.2 Always check the used vehicles to prevent loose parts and oil leakage. \x0d\ 4.4.2 Conduct regular overhaul and maintenance of generators used by all units in the management office to prevent oil leakage, and keep records of generator operation. \x0d\ 4.5 Plan Pre-statistics \x0d\ 4.5. 1 Annual water-saving, electricity-saving, coal-saving and fuel-saving index plans are put forward by each unit, reported to the management office for summary, and promulgated and implemented after being examined and approved by the competent leaders. \x0d\ 4.5.2 The office area of the management office and all units must fill in the energy saving and consumption reduction report (\x0d\) every quarter and report it to the management office at the beginning of the quarter (1-5). \x0d\ 4.5.3 After verifying the report on energy saving and consumption reduction (), the office shall fill in the summary table on energy saving and consumption reduction, and make statistical analysis according to the consumption progress, which will be included in the annual report. \x0d\ 4.5.4 The office shall inspect the work of the departments under its jurisdiction once a year, give full play to the role of the main channel, and strive to make energy saving and consumption reduction a conscious action of all employees. \x0d\ 5 record \x0d\ 5. 1 energy saving and consumption reduction (\x0d\) report (ah-15-B01) \ x0d \ 5.2 summary of energy saving and consumption reduction (AH- 18