Xingneng Tunlan installed capacity
3 1.2 million kilowatts. The installed capacity of Xingneng Power Plant located in Tunlan mining area is 310.2 million kilowatts. Xingneng Power Generation Company is a real pithead power plant, built only 800 meters away from the wellhead of the main inclined shaft of Tunlan Mine with an annual output of 5 million tons of raw coal, and within 13 kilometers from the other four mines.