Brilliant achievements of Chongqing Branch of Gezhouba Group Fifth Engineering Co., Ltd.

The company has 43 sets of underwater construction ship equipment. Our company enjoys the reputation of "Gezhouba Navy" and has a glorious tradition and outstanding performance. Over the past 30 years, he has participated in the underwater excavation and transportation of sand and gravel aggregates in Gezhouba Hydropower Station, Three Gorges Hydropower Station and other national large-scale hydropower stations, and undertaken large-scale projects such as dredging of the Beijing-Hangzhou transport canal, dredging of the Hong Kong International Airport, underwater excavation of the diversion channel of Gezhouba, leveling and roughening of the bottom of the Three Gorges Reservoir, and dismantling of the second-stage cofferdam of the Three Gorges, making contributions to the hydropower cause of the motherland. Since entering the Chongqing market, it has undertaken the construction of Caojie to Beibei Section C of the second phase of Jialing River waterway regulation project.