Summary of the annual work of the quality department of pharmaceutical factory

Annual work summary of quality department of pharmaceutical factory: put drug quality first, ensure the safety of people's medication, supervise the implementation of GSP, always consider the interests of the company, do your job patiently and enthusiastically, and work hard. The following is a summary of the annual work of the quality department of pharmaceutical factory, which I compiled for you, hoping to help you. Welcome to read the reference study!

The year 1 20__ has ended. Looking back on the road I have traveled this year, I always feel trapped in memories and sighs. 20__ is a turning point in my life journey. This year, I have faced more challenges and thoughts in my post, which also means that this is an era where opportunities and challenges coexist.

First, study hard and strive to improve.

I met some difficulties at the beginning of my work, but that's not the reason. I want to learn a lot about the industry and office staff, so that I can not be eliminated in the process of continuous development and change of the times, and the work we do is also changing with the times to meet the needs of the work.

Second, the correct style and correct position.

In my work, I will adhere to the diligent, pragmatic and efficient work style and do a good job seriously. Obey the leadership division of labor, regardless of gains and losses, do not pick the weight. We only pay attention to the importance of work and try to do our work well in the least time. In the future work, we can't delay anything assigned by the leaders. In life, we should adhere to the honest, modest and simple life style, straighten our position, respect leaders, unite with comrades, get along on an equal footing, treat others sincerely, do not follow the trend, do not bully the weak and fear the hard, correctly handle the relationship between rulers and leaders and colleagues, stress principles on major issues, stress style on minor issues, and consciously resist the erosion of decadent ideas.

Third, there are problems.

Through a period of work, I also clearly see that I still have many shortcomings, mainly manifested in: First, the pace of work is always slower than the tasks assigned to me, so I have to prioritize my work and record every work in this book in case I miss anything. Second, due to limited ability, some things are still not handled properly.

Fourth, keep your feet on the ground and work hard.

In the new year, due to lack of work experience, some problems have been exposed in practice. Although I hit many walls, I also got many opportunities to hone. These opportunities are practical and effective for me. This is the most experience I have learned from my work since the second half of this year. In my future work, I will continue to adhere to my consistent? Be lenient with others and strict with yourself? Work motto, and will continue to improve and refine their work at the same time, by actively charging in technology to further enrich themselves, from the technical level to enhance their ability.

In short, in my work, I have gained a lot through hard work and continuous exploration. I firmly believe that I can do it well as long as I work hard.

The annual work summary of the quality department of pharmaceutical factory is coming to an end, and the 20-year work is coming to an end. In this year, my work overcame difficulties through my own efforts, especially with the strong support and guidance of the leaders, I successfully completed my tasks and work for 20 years, which is a significant year for me.

In the past 20 years, my work has gone through two stages. Before May, I worked as an assistant in the workshop of the head office, which enabled me to learn the relevant technology and gmp knowledge from the front line. At the same time, as a night attendant, I insist on working at night 1 week. Complete the basic duties of process assistant. I started to enter Taizhou Xianju Pharmaceutical in May, which was the new beginning of my work and study. I successfully completed the drafting of gmp-related software materials such as the pre-trial production process specification and trial production plan of cortisone acetate. At the same time, as a technician to participate in process determination and production line construction. As a member of the trial-production team, he participated in the whole trial-production process of cortisone acetate and completed the confirmation of process parameters in the trial-production process. Through this project, I became familiar with the company's operation process, learned the relevant practical knowledge of process amplification, and also contacted the engineering-related knowledge such as equipment selection, plant design and process layout, which laid a certain experience foundation for future work and pointed out the direction for my future development. At the same time, I participated in the company's internal auditor training, obtained the qualification of internal auditor, became the workshop internal auditor, and completed the drafting and management of some ehs documents related to the workshop and site. Actively participate in the establishment and improvement of the company system. Organize and save the relevant documents and materials of the workshop. At the same time, learn and grow through participation, and work with the company to constantly improve their awareness and ideas, as well as work ability. Actively participate in other activities or projects of the company. Try your best to participate in the development and construction of the company. It is intended to develop and grow together with the company. Although I have gained something in the past 20 years, I am also aware of my many shortcomings:

1. Although full of enthusiasm, but lack of experience, there is a great lack in dealing with emergencies and some new problems. Need further efforts and study.

2. It is not enough to communicate and discuss with colleagues at work. Many of my immature ideas and concepts need the teaching of colleagues and leaders.

3. The management ability of gmp and ehs on site is still relatively weak, and many things are not handled properly.

4. Professional ability, especially technology and equipment, is still lacking, and it is urgent to make up for it by our own efforts. In our future work and life, we must make more active efforts to improve our professional ability and strengthen our professional knowledge and skills. And set high standards for yourself and keep learning, in order to become an excellent process technician.

20__ is a year full of expectations. For the company, 20__ is a new starting point for the synchronous design and construction of three listed projects and the continuous construction of living and office facilities. This is a brand-new beginning for me. The trial production of cortisone acetate project is coming to an end. After the initial stability, formal production and comprehensive personnel will be ushered in. Because of this, process verification and personnel training will be my focus in the first 20 years. At the same time, with the commissioning of the synthetic solvent recovery workshop, it is also important to stabilize and improve the solvent recovery process. At the same time, I personally want the development direction of engineers, so I will try my best to participate in other projects of the company and get in touch with engineering as much as possible. Let yourself learn and grow through participation.

20__ annual work plan

1. Strengthen study and practice and make continuous improvement. Based on their own posts, focus on in-depth study of intelligent transportation related business and research and development related knowledge, and improve the ability to solve problems.

2. Make every effort to finish the task. In the next 20 years, there will be many challenging and important tasks, such as process verification, staff training, gmp and ehs implementation in the workshop, etc. These are all challenging jobs for me; Self-study and promotion when participating in other projects at the same time, as well as the promotion of knowledge required by other projects. Now it's just participation and recording, and I hope to put forward constructive opinions in the near future.

3. Improve your own quality. In the new year, we should unswervingly strive to become a smart person with good moral character, high quality, strong ability, diligent study, good thinking and ability to do things. At the same time, we also strive to improve our interpersonal and social skills.

3 __ Annual Work Summary of Quality Department of Pharmaceutical Factory _ _ Under the correct leadership of the branch company, the technical quality department of interchange engineering adopted? Quality first, technology first? For the established goal. There are key projects? As a carrier, the Tianjin-Laiyuan Road Interchange on the Outer Ring Road draws lessons from the previous construction experience in terms of technical quality, and inherits and breaks through on this basis.

I. Technical work

According to the construction characteristics and difficulties of this project, the Technical Quality Department of Tianjin-Qiandao Interchange Project on the Outer Ring Road has determined the reasonable construction technology for each key construction site and construction link through on-site investigation and accurate calculation, and formulated an effective construction technical scheme. And before the implementation of the process, arrange technical disclosure and brainstorm feedback questions. Monitor and improve the whole construction process to ensure the feasibility of construction technology. Overcome the technical difficulties of key components.

Second, the quality of work.

1, in the field construction, every quality inspection process will be carried out, and the responsibility will be implemented to people according to the parts. According to each construction process? Three inspections? Provisions on the administration of quality inspection. Do it at work? Sanqin? Diligent eyes, diligent mouth and diligent mind.

2. Correct the illegal operation and quality problems of the subcontracting team in time, and effectively manage the subcontracting team in strict accordance with the punishment measures for engineering subcontracting quality management of the branch company.

3. Strictly control the appearance quality and strengthen the daily inspection. Regularly supervise and summarize industry information. Ensure the timeliness and completeness of engineering survey and completion data.

Although some achievements have been made in the work of _ _ _, there are still many shortcomings to be improved. Looking forward to the work in _ _ _, I have the following thoughts on the work of Tianjin-Laiyuan Road Interchange Project in the new year:

A, construction management

1. First of all, the technical quality department should strengthen the horizontal contact and communication with all departments and offices. No department can exist and operate independently, and all departments and offices should establish cooperative relations. Only through regular communication and mutual cooperation can all departments find problems and correct mistakes in time. This is also the key to the formulation, implementation and execution of process plan. At the same time, it is also necessary to clarify the division of responsibilities and rights of various departments, especially the details. Unnecessary troubles caused by unclear division of responsibilities between departments should be avoided.

2. On the other hand, all departments and offices should strengthen contact and cooperation with the team. The team is the person who manages the site, so it is particularly important for us to establish a good relationship with the team, which will greatly help to improve the work efficiency of the technical quality department in site construction quality control, and also help us to carry out our work with high quality and efficiency.

3, establish the responsibilities of various departments, clear to people. The purpose of defining job responsibilities is to clarify the division of labor and cooperation between members, so that the work of the department can be carried out efficiently and orderly.

4, should strengthen the familiar with the contents of the project contract, in the process of construction in a timely manner to statistics of quantities, for the record, make detailed records, keep the relevant text and video materials, for use in the final accounts of the project and claim. For subcontracted projects, the personnel of the project technical department should be more familiar with the contract, so as to clarify the relationship between the responsibilities, rights and interests of both parties. It is more conducive to the development of on-site project management and provides a strong guarantee for project quality and enterprise benefits.

Second, the technical quality

In daily technical work, our work generally focuses on three points: first, on-site quality control; The second is the test and inspection of raw materials, finished products and semi-finished products related to the project; The third is the collation of technical data.

1. In terms of on-site quality control, a full-time and part-time quality engineer system is implemented. The full-time quality controller will bring the old with the new, cultivate new people, and pay special attention to the on-site quality work to ensure that the progress and quality of each working procedure are under control.

2, should strengthen the management of the test work. First of all, it is necessary to ensure that the testers master the first-hand information on the use of raw materials on site. Test workers are required to go to the site every day to investigate the feeding and use of raw materials. According to the feeding situation and specification requirements, witness sampling is carried out reasonably, and the test cost is strictly controlled.

3. The compilation and arrangement of technical data is a very important work. In order to avoid the confusion of data, it will bring trouble to many aspects such as measurement and payment, data access and completion work. Data management personnel should strictly summarize management data, do a good job in data classification and filing, and prevent data management from being chaotic. In addition, data management personnel are required to be familiar with the construction site properly, which is also conducive to the compilation of technical data.

Third, process efficiency.

In the process of formulating the process plan, several sets of alternative plans should be worked out according to the cost required for construction and the operability of the process plan, and then the plan with comprehensive indicators such as cost and operability should be selected as the technical guidance for construction, so as to control the project cost in technical links and create benefits for enterprises.

Four. Job prospect

As a member of the Tianjin-Laiyuan Road Interchange Project of the Outer Ring Road, we should strengthen team spirit and twist into a rope in our future work. Focus on the interests of the project, as always, adhere to the rigorous and pragmatic style, constantly improve yourself, further solve and improve the quality, technology, construction and management problems in the construction, and make yourself by going up one flight of stairs.

?