Which is the first large-scale commercial nuclear power plant in China?

The first large-scale commercial nuclear power plant in China is Daya Bay Nuclear Power Plant.

Daya Bay Nuclear Power Station is the first large-scale commercial nuclear power station in Chinese mainland and the first nuclear power station built in Chinese mainland with foreign technology and capital. Located in Dapeng Peninsula, Dapeng New District, Shenzhen City, Guangdong Province, China, with a linear distance of 5 1km from Tsim Sha Tsui, Hong Kong, it is jointly built and operated by Guangdong Nuclear Power Investment Co., Ltd. and Hong Kong Nuclear Power Investment Co., Ltd. and belongs to China General Nuclear Power Group.

There are two million kilowatt PWR units, 80% of which are supplied to Hong Kong and 20% to Guangdong. The power station started construction in 1987, 1 February 1994, and1unit was put into commercial operation. In May of the same year, Unit 2 was put into commercial operation. Since then, Ling 'ao Nuclear Power Station has been built next to Daya Bay Nuclear Power Station, which together constitute a large nuclear power base. 20 16 1 1 month, Daya Bay Company won the 16th National Quality Award.

Power station scale:

1. At present, there are 6 generator sets in Daya Bay Ling 'ao Nuclear Power Station, with a total installed capacity of 61.2000 kilowatts. In the organizational structure, it is divided into three entities.

2. The owner of Daya Bay Nuclear Power Station is Guangdong Nuclear Power Joint Venture Co., Ltd., and the main shareholders of this company are China General Nuclear Power Group Co., Ltd. (75%) and CLP Holdings Co., Ltd. (25%).

3. Daya Bay 1 The installed capacity of the unit is 984,000 kilowatts, and1August 1993 was connected to the grid for power generation.

4. Daya Bay Unit 2 has an installed capacity of 984,000 kilowatts, and was connected to the grid for power generation in February 1994.

5. The owner of Ling 'ao Nuclear Power Station is Ling 'ao Nuclear Power Co., Ltd., and the main shareholder is China Guangdong Nuclear Power Group Co., Ltd. (100%).

6. The installed capacity of Ling 'ao 1 unit is 990,000 kilowatts, which was connected to the grid in February 2002.

7. The installed capacity of Ling 'ao Unit 2 is 990,000 kilowatts, which was connected to the grid for power generation in September 2002.

8. The installed capacity of Ling 'ao Unit 3 is 654.38+0.086 million kilowatts, and it was connected to the grid for power generation in September 2065.438+00.

9. The installed capacity of Ling 'ao Unit 4 is 654.38+0.086 million kilowatts, and it was connected to the grid for power generation in August of 2065.438+0. 1 year.