House demolition agreement

In the ever-changing modern society, agreements are more and more widely used in life, and signing agreements can solve or prevent unnecessary disputes. So how can the agreement be written to play its greatest role? The following are six agreements on house demolition that I have compiled for you, for reference only. Welcome to reading.

House Demolition Agreement 1 Party A (construction unit):

Legal representative:

Party B (construction unit):

Legal representative:

In order to strengthen the safe construction management of house demolition, conscientiously implement the working policy of "safety first, prevention first", put an end to major accidents and ensure the safety of people's lives and property, Party A entrusts Party B to demolish XX house according to the Law of People's Republic of China (PRC) on Work Safety and the Regulations on the Administration of Work Safety in Construction Projects, and both parties sign a responsibility letter for the safe construction of house demolition through consultation.

I. Responsibility of Party B

1. Party B shall conscientiously implement the Law of People's Republic of China (PRC) on Work Safety, the Regulations on the Administration of Work Safety in Construction Projects and other laws and policies related to work safety.

2. Party B shall improve the safety production system, establish a responsibility system with the legal representative as the first responsible person, improve emergency rescue measures, and ensure safe construction, so as to achieve "organization and guarantee, tasks and requirements, work and inspection, and preventive measures".

3, clear the responsibility of production safety of house demolition, and sign a letter of responsibility for safe and civilized construction with the project leader.

4. Fencing facilities and warning signs shall be set around the construction site, and fire-fighting facilities conforming to the specifications shall be equipped to maintain a good standby state. Temporary facilities, mechanical equipment and building materials shall be arranged according to the general construction plan, so as to ensure the smoothness and tidiness of entrances and exits and the site.

5. Before demolishing the old house, cut off the power supply and turn off the natural gas. When demolishing buildings, protective frames and protective nets should be set up. Construction personnel should wear safety helmets and hang safety ropes according to regulations, effectively control dust, noise and vibration in the construction process, transport building materials and dispose of construction dregs and various wastes according to relevant regulations.

6. Party B shall not commit any of the following acts during the house demolition construction: throwing garbage at high altitude; Backfilling toxic and harmful wastes as earthwork; Mud water is directly discharged into urban drainage facilities or rivers without treatment; Melting asphalt or burning linoleum, paint and other substances that produce toxic and harmful smoke and gas at the construction site without qualified devices; Working, living or non-operating in the building to be demolished; Other acts that should be prohibited.

7. Actively cooperate with the supervision, inspection and guidance of relevant departments. For the existing problems, it is necessary to formulate rectification plans such as rectification measures, financial guarantee and completion date, take effective measures in time to eliminate potential safety hazards, submit written materials for safety inspection and rectification within the specified time, and submit the rectification situation to Party A. ..

8. Strengthen construction site management and improve various safety protection facilities. In the event of a safety accident, immediately organize forces to rescue, put an end to casualties to the maximum extent, report the accident in time, and do not delay or conceal the accident. After the safety accident, it is necessary to protect the site, actively cooperate with relevant departments to do a good job in investigation and evidence collection, and do a good job in the aftermath in accordance with responsibilities and relevant regulations to eliminate potential safety hazards.

Two. Party A's responsibilities

1. Timely convey and inform the important instructions and requirements of relevant functional departments on safety production, and urge Party B to implement safety construction.

2, in violation of the norms of safe production, timely report to the relevant functional departments for investigation.

3. In case of a safety accident, in addition to timely reporting to the police, it is necessary to report to the relevant functional departments at the first time, and the accident shall not be delayed or concealed. At the same time, protect the site, maintain order, and organize forces to cooperate with relevant departments to do a good job of disposal.

Three. In order to ensure the safe and smooth progress of house demolition construction, Party B shall pay RMB deposit to Party A.. When a safety accident occurs, Party A has the responsibility to urge Party B to handle it in time. If Party B fails to handle it in time, Party A can handle it by itself, and the required funds will be deducted from the safety production deposit. For the insufficient part, Party A can recover from Party B through other legal channels. After the house demolition construction is completed and no safety accident occurs, Party A shall return the security deposit for production safety to Party B. ..

Four. Other agreements:

1、

2、

3、

5. This responsibility book is made in triplicate, one for Party A, one for Party B, and one for the record of the house demolition safety construction management department.

Party A (construction unit):

Legal Representative: Address:

Party B (construction unit):

Legal Representative: Address:

date month year

Part II of House Demolition Agreement Employer: (hereinafter referred to as Party A):

Contractor: (hereinafter referred to as Party B):

In accordance with the Contract Law of People's Republic of China (PRC), Technical Regulations for Safety of Construction and Installation Engineering and other relevant laws and regulations, in order to clarify the rights and obligations of both parties in the process of house demolition, the following agreement is reached on house demolition through negotiation for both parties to abide by.

Rule number one. Project name: two two-story brick-concrete buildings, one kitchen and its accessories.

Article 2, construction method and enclosure structure. In case of manual demolition, Party B must maintain the Dongshan wall during the demolition process and ensure that the integrity of the Dongshan wall is not damaged; Brick the truss hole, and lay a row of blue tiles along the wall above the Dongshan wall to prevent rain. During construction, the prefabricated panels of the East House are cut along the gables first, then hammered, and the straight walls connected with the gables before and after demolition are cut neatly; Try to avoid the influence of construction noise on the east neighbors; The kitchen retains the northern part of the roof truss.

Article 3: Remuneration for demolition work: All demolition materials shall be owned by Party B, and Party A shall not pay other wages. Construction waste will be transported abroad, and RMB will be additionally subsidized.

Article 4. Construction safety requirements: Party B must carry out the construction according to the requirements of technical specifications for safe construction and take strict safety measures. In the process of construction, we should pay special attention to safety and put an end to all accidents. The responsibility for accidents caused by our poor safety measures shall be borne by us, and all expenses arising therefrom have nothing to do with Party A, and the construction personnel must wear safety helmets.

Article 5. Party A shall recycle the complete red bricks of the demolished house per yuan, and Party B must clean up the mortar mud and cement slurry on each red brick, and pile them neatly in rows on the courtyard wall of Party A's backyard, with the height of each row flush with the height of the courtyard wall.

Article 6. Responsibilities and obligations of both parties:

I. Responsibilities and obligations of Party A

(1) is responsible for dismantling water, electricity and communication facilities.

⑵ Cooperate with Party B to coordinate all aspects.

Two. Responsibilities and obligations of Party B (1) According to the requirements of Party A, the demolition work was started at 8: 00 on May XX, and the construction period was successfully completed.

(2) All kinds of accidents and administrative penalties caused by Party B shall be borne by Party B itself.

(3) All construction waste must be transported out of the urban area in accordance with the Regulations on City Appearance, and the stacking place must meet the requirements of laws and regulations.

Article 7. Duration: 10 days. Party B delays payment of liquidated damages for one day, 500 yuan.

Article 8. This agreement is made in duplicate, which shall come into effect after being signed by both parties, and each party holds one copy. Matters not covered in this contract shall be discussed separately by both parties.

Party A:

Party B:

May XX 1

Part III of House Demolition Agreement Party A (project contractor): Project Department of No.2 plot of Shenglong Square of Shaanxi Foreign Economic Relations and Trade Industry Group Co., Ltd.

Party B (project contractor):

According to the relevant provisions of the Contract Law of People's Republic of China (PRC), Party A and Party B agree to sign this contract through friendly negotiation on the principle of equality and mutual benefit.

Article 1 Contents of dismantling and installing prefabricated houses:

Party A entrusts Party B to demolish the movable board house (Fangxin Village) in the No.2 plot project of Shenglong Plaza of Shaanxi Foreign Trade and Economic Cooperation Industrial Group Co., Ltd., with an area of about square meters.

Article 2 The charging standard for Party B to dismantle the transportation prefabricated houses for Party A is:

According to the unit price of RMB/㎡, the specific work includes: demolition, transportation to the place designated by Party A, sorting and orderly stacking.

Article 3 Payment Terms

After all the work is completed and accepted by Party A, Party B shall provide legal and effective tax invoices and pay them to Party B in one lump sum.

Article 4 Matters related to Party B's services

Carry out construction and production in strict accordance with relevant national codes and regulations to ensure the intact rate of disassembled parts;

Carry out construction and production in strict accordance with national safety production standards. If a safety accident occurs due to Party B's own reasons, Party B shall bear all the responsibilities. In order to clarify the safety responsibilities of both parties and prevent accidents of Party B's construction personnel, the following agreement is signed by both parties through consultation:

I. Party A's safety responsibilities:

I, involving the temporary trailer installation work on the construction site, should assign special personnel to check and supervise, coordinate and solve the problems in the construction in time.

2. Before starting work, safety technical disclosure shall be made to the person in charge of Party B's unit and relevant engineering and technical personnel.

3. If working in the installation area may cause power failure or shutdown accidents of production equipment, Party B is required to formulate "three measures" (namely, organizational measures, technical measures and safety measures) in advance, and review and supervise their implementation.

4. Countersign the working ticket issued by Party B's unit.

5, hand over to treat safety precautions to the members of the working class, and strictly implement monitoring in the construction.

6. Issue "badge" with my photo to Party B's construction personnel, and wear it when taking up the post.

7. Party B's personnel shall not be arranged to engage in work unrelated to the contracted project.

8, after the completion of the project, should organize acceptance, to make a comprehensive evaluation of the safety and quality of equipment.

Two. Safety responsibilities of Party B:

1. Organize the construction personnel to learn the Work Rules for Installation Safety of Temporary Mobile Homes on Site issued by Party A, the Work Rules for Installation Safety of Temporary Mobile Homes on Site and related safety production rules and regulations. The dispatched construction personnel must be those who have passed the safety education, training and assessment (or assessment) of Party A, and the construction personnel of Party B should wear the badge issued by Party A. Party B shall not send personnel who have not passed the safety education, training and assessment (or assessment) of Party A to work on the construction site.

2, complex or dangerous links, should formulate the construction "three measures". Party A shall implement it after passing the examination.

3. Before the project starts, safety technical disclosure must be made to all installation and construction personnel, so that all construction personnel can master the project status, characteristics and construction "three major measures" and be responsible for on-site construction safety.

4. In the process of construction, we must strictly implement the Safety Work Regulations for Installation of Temporary Mobile House on Site, the Safety Work Regulations for Installation of Temporary Mobile House on Site and Party A's regulations and requirements on safe and civilized construction. When entering the installation site area for construction, the working ticket system must be strictly implemented in accordance with the regulations. For the work that does not need to use the working ticket, the consent of the personnel on duty should be obtained before starting the work.

5. Before starting work, the devices, instruments and safety protection facilities shall be inspected to ensure compliance with safety regulations, and the inspection period shall not exceed.

6, must according to the provisions of the state for the construction personnel equipped with qualified occupational protective equipment, appliances; Do not use underage workers and old, weak, sick and disabled people who do not meet the requirements of on-site safety construction; Special operations should send certified personnel who have passed the safety technical training of relevant departments.

7. Party A's safety supervision, management and guidance must be accepted, and the opinions put forward by the person in charge of the enterprise (the first person responsible for safety construction) to Party A's safety management personnel must be rectified in time, otherwise Party A has the right to order Party B to stop construction, and all losses caused thereby shall be borne by Party B; In case of personal accidents and unsafe conditions, Party B must immediately report to the person in charge of Party A's unit.

8. During the construction process, Party B's construction personnel shall not enter Party A's other non-construction production and office premises without authorization, and shall not operate any electrical equipment without authorization. If it is possible to touch or approach high-voltage equipment, it is necessary to stop the construction and take the initiative to contact Party A, and then continue the construction after taking safety measures and obtaining Party A's permission.

9. The project shall not be subcontracted again.

Three. During the construction period, Party A assigns Comrade Chen Kun to be responsible for contacting, inspecting and urging Party B to implement relevant safety regulations; Party B shall designate comrades to be responsible for the safety of this project. Party A and Party B should always contact and assist each other to prevent accidents.

Four. In the process of construction, Party B must strictly implement the safety regulations for the installation of temporary mobile houses on site and various construction safety measures. Personal electric shock accidents caused by Party B's failure to seriously implement safety measures and Party A's relevant safety instructions shall be borne by Party B. Other accidents not caused by Party A in the construction process shall be borne by Party B and shall be invalid.

V. Matters involving the project business that must be made clear (scope of work, operation area, issuance of working tickets, etc.). ), and attach another page.

Article 5 For matters not covered in this contract, both parties shall sign a supplementary agreement after consultation in the spirit of friendly cooperation, and the supplementary agreement shall have the same effect as this contract.

Article 6 This contract shall come into force as of the date of signing, and shall automatically become invalid after the completion of the contract. In case of any dispute during the performance of this contract, both parties shall settle it through consultation; If negotiation fails, it shall be submitted to the people's court where the project is located for litigation.

Article 7 This contract is made in duplicate, with each party holding one copy.

Party a: xx

Company name (official seal): xxx

Address: xxx

Representative of Party A (signature): xxx

Date: x year x month x day

Tel: xx

Contract signing place: xxx

Party b: xxx

Company name (official seal): xxx

Address: xxx

Representative of Party B (signature): xxx

Date: x year x month x day

Tel: xxx

In order to strengthen the management of house demolition construction activities, improve the level of safe production and civilized construction, prevent and reduce the occurrence of safety accidents, and ensure the smooth progress of engineering construction activities, according to the requirements of laws and regulations such as the Building Law, the Safety Production Law, the Regulations on the Administration of Safety Production in Construction Projects, and the Measures for the Supervision and Administration of Construction Safety in Suzhou, we promise to do the following:

1. The construction unit or the demolition implementation unit will contract out the project to be demolished to a construction enterprise with corresponding qualification grade, and go through the safety supervision formalities at Suzhou Construction Industry Safety Supervision Station with the following documents and materials before the demolition project construction 15: 1, the qualification grade certificate of the construction unit; 2. Buildings and structures to be demolished and adjacent buildings that may be endangered; 3. Dismantle the construction organization plan; 4, demolition project director, technical director, safety officer and homework personnel list and a copy of ID card; 5. Measures for stacking and removing wastes.

Two, the construction unit to provide the demolition of housing construction units to be demolished building engineering structure, pipeline diagram and the surrounding environment.

Three, the construction unit to carry out comprehensive coordination of housing demolition construction activities, according to the requirements of safe production and civilized construction, inspection and supervision of construction safety and environmental sanitation.

4. In case of any of the following circumstances on the construction site, the construction unit shall apply for approval in accordance with relevant state regulations: 1. Temporary occupation of the site beyond the approved scope; 2, shall not damage roads, pipelines, electricity, posts and telecommunications, communications and other public facilities; 3, the need for temporary water, electricity, road traffic interruption; 4. Other circumstances stipulated by laws and regulations.

Five, the housing demolition construction unit is fully responsible for the safety of the demolition project, and does not subcontract or illegally subcontract the demolition project.

Six, the demolition of housing construction units to conduct a detailed investigation and on-site investigation of the proposed demolition of housing construction projects, the preparation of the demolition construction organization plan. Demolition of more than three floors of housing construction projects and water towers, chimneys and other structures, to prepare a special safety construction organization design. In the preparation of construction scheme or construction organization design, safety technical measures to prevent demolition accidents should be formulated. The construction scheme or construction organization design shall be examined and approved by the technical director of the enterprise. When a building project is demolished by blasting, its construction scheme or construction organization design must be approved by the public security department.

Seven, housing demolition project, the construction site to set up a closed fence enclosure, the demolition of houses located on both sides of the primary and secondary roads and downtown areas and residential areas, to achieve "first protection, then demolition." The protective frame shall be totally enclosed, with reliable nodes and reasonable fixed points, which can meet the requirements of overturning resistance.

Eight, the door of the house demolition project is clearly set with construction signs, indicating the name of the construction unit, the responsible unit of enclosure, the name of the person in charge of the house demolition construction unit and the construction site, the name of the technical person in charge, the name of the safety officer, the safety supervision registration number, and the supervision telephone number. And accept social supervision. Safety signs should be hung in the dangerous areas of the construction site and the dangerous areas facing the street and the road, and red lights should be used for warning at night. In the construction of vehicles and pedestrians, effective and convenient measures should be taken.

Nine, located on both sides of the primary and secondary roads and downtown areas, residential areas, construction time should avoid peak hours, not from 22 pm to 6 am the next day; During the "senior high school entrance examination and college entrance examination", the demolition construction will be stopped within the radius of the examination room 100 meters. If key projects or demolition projects must be constructed at night, an application should be submitted to the neighborhood committee where the project is located in advance, and the construction can only be started after being audited by the safety supervision station and approved by the district environmental protection bureau.

Ten, housing demolition construction units should standardize the employment behavior, strengthen safety education and training, and shall not recruit "three noes" blind people, and shall not arrange personnel suffering from heart disease, hypertension and epilepsy to engage in aerial work. New workers and shift workers must be trained and qualified before taking up their posts, and special operators and mechanical operators must hold relevant certificates. Before the demolition construction, the technical director of the construction unit shall disclose the safety technology and civilized construction to the operators, and inform them of the basic requirements and safe operating procedures of the operation. The disclosure person and the disclosed person shall sign separately. The person in charge of the construction site shall conduct pre-operation education for the on-site operators, and the safety officer of the construction site shall record the education content, personnel and the "safety log" of house demolition construction.

Eleven, housing demolition construction unit project director, technical director, security officer to command at the scene, and urge workers to strictly follow the provisions of the construction plan. All operators on the construction site should strictly abide by the mandatory standards formulated by the state and the safety technical regulations for construction and installation projects, wear safety helmets, and it is forbidden to wear sports vests, shorts, slippers and work at their posts after drinking. When working at heights, the demolished materials shall not be thrown down at will, and the demolition construction shall not be carried out by hand. When using cranes or lifting equipment, there must be a special person to command, and the operators, commanders and cable operators must strictly abide by the operating rules. Overloading and oblique hoisting are not allowed, and illegal command and operation are strictly prohibited.

Twelve, the house demolition construction unit for pipeline and container demolition, to find out the purpose of the pipeline and container, take corresponding measures to remove waste gas and waste liquid before construction. When using electric welding, the relevant regulations on open flame operation must be strictly implemented, and monitoring personnel and fire extinguishing equipment should be equipped.

Thirteen, in case of severe weather such as rain, snow, fog, strong wind, etc., the demolition construction should be stopped. The construction unit shall not use the buildings and structures that have not been demolished as temporary offices, accommodation and warehouses.

Fourteen, found in the construction of cultural relics, explosives and unknown cables, pipelines and structures, to stop the operation, protect the scene, and report to the relevant units and departments, after approval to resume construction. 15. Dust prevention measures should be taken during construction to reduce environmental pollution. Remove all kinds of materials and components to clear in time, neatly stacked. Construction waste should be transported to the place designated by the city appearance and environmental sanitation department in time for dumping, and no environmental pollution such as throwing, sprinkling, dripping and leaking may occur during transportation. Don't burn garbage at the construction site.

Sixteen, housing demolition construction units should be engaged in dangerous operations in the construction site personnel for accidental injury insurance.

17. After the construction, the site should be cleaned and leveled, and the municipal public facilities damaged by the construction should be repaired in time.

Eighteen, the safety supervision and inspection of production safety supervision institutions shall cooperate and support without affecting the normal construction activities of the project.

19. During the demolition of this project, the national and provincial standards, specifications and procedures for house demolition projects will be strictly implemented to ensure safe production.

Twenty, this guarantee is in duplicate, one for the safety supervision station for the record, one for the construction site project department.

Construction Unit/Demolition Implementation Unit (Seal)

Signature of site representative:

date month year

Housing Demolition Construction Unit (Seal)

Signature of project leader:

date month year

Article 5 of the House Demolition Agreement Party A: Party B:

In accordance with the Contract Law of People's Republic of China (PRC), the Construction Law of People's Republic of China (PRC), the Detailed Rules for the Implementation of the Management of Urban House Demolition in Langfang and other relevant laws and administrative regulations, and following the principles of equality, voluntariness, fairness and honesty and trustworthiness, Party A and Party B reached an agreement on the contracting of the demolition project within the scope of project demolition through friendly negotiation, and concluded this contract.

A, the demolition project overview:

Name of demolition project:

2. Location of demolition project: 3. Scope of demolition contract:;

(See Annex I: Schematic Diagram of the Scope of Demolition Contract for the specific scope)

4. Total area of demolished buildings:.

Second, the demolition project contracting work content:

1. Mobilize the demolished people within the contracted scope within the specified time limit, organize the signing of the demolition compensation agreement, and supervise the demolished people to vacate the demolished houses as required;

2. Organize the demolition of all kinds of buildings, structures and other appendages within the contracted scope to the ground, including building foundations, but excluding all kinds of underground facilities such as underground pipelines and lines; 3. The residual value of buildings demolished within the contracted scope shall be owned by Party B. ..

Three. Contract price:

1. The contract price is a fixed total price;

2. The contract price shall be paid by Party B to Party A;

3. Contract amount: in figures:

In words: (RMB)

4. The risk scope included in the contract price: due to the uncertainty of the demolition area and building structure; Construction period caused by civilized construction requirements; Various regulations and requirements for abandoned sites due to construction waste; Transportation time limit caused by urban traffic road management requirements;

5. Payment method: Within days after the project is completed and accepted, Party B will remit all the contract money to the bank account designated by Party A;

6. Deposit: In order to ensure the project quality, construction safety and construction period, Party B shall pay% of the total contract price to Party A as deposit on the date of signing this contract.

IV. Term of the contract:

1. Commencement time: year month day, completion time: year month day, and total calendar days of the contract period: days;

2. If there is any change in the contract period and work schedule, the written notice of Party A shall prevail.

Five, quality requirements:

1. Relocation mobilization requirements: All the relocated people within the contracted scope shall sign the relocation compensation agreement according to the required time, and supervise the relocated people to vacate the demolished houses as required, and take back the house keys to meet the relocation requirements;

2. The quality standards of the building demolition project agreed by both parties are: all kinds of buildings, structures and ground attachments (including foundations) within the contracted scope have been demolished, all demolition materials have been removed, the site has been cleared and leveled, and underground facilities such as underground pipelines are in good condition.

Six, the composition of the contract documents include:

The terms of this contract; 2. Relevant drawings and text descriptions;

3. Written records, explanations, notices, letters, emails and related documents related to the negotiation and change of the project contract.

Seven. Rights and obligations of Party A:

1. Provide documents and materials required for Party B's mobilization and demolition, and conduct necessary training for Party B's personnel;

2 responsible for the demolition of water, electricity, heating, gas and communication;

3. Organize the project acceptance in time after the project is completed.

Eight. Rights and obligations of Party B:

1. Party B must have relevant building demolition qualification stipulated by the state and file with Party A.. Be responsible for all the formalities required for house demolition, and the expenses shall be borne by Party B. In case of investigation by law enforcement departments, Party B shall handle it by itself and bear the relevant expenses;

2. Party B shall complete the agreed work contents on schedule;

3. Party B shall remove the construction waste in strict accordance with the transportation route designated by Party A;

4. Party B shall take effective safety measures according to regulations and protect Party A's related facilities. All accidents, such as fire, theft, transportation, casualties, etc. The demolition in the project shall be undertaken by Party B;

5. Pay the contract price and deposit in time as stipulated in the contract.

Nine. Liability for breach of contract:

1. If Party B fails to complete the corresponding work content according to the time limit or work schedule agreed in the contract or notified by Party A in writing, Party A has the right to unilaterally terminate the contract and detain the deposit paid by Party B to Party A, and Party B shall pay% of the contract amount to Party A as liquidated damages;

2. Party B shall carry out construction safely in strict accordance with national regulations. In case of a liability accident that affects the contract period or Party A's work, Party A has the right to deduct the deposit paid by Party B;

3. After the completion of the project, if the acceptance does not meet the quality standards required by Party A, Party B shall immediately rework until the project meets the quality standards, and Party A has the right to detain the deposit paid by Party B;

4. If Party B causes damage to underground pipelines or other public facilities during the construction, Party B shall be liable for compensation according to the actual losses, and Party A has the right to detain the deposit paid by Party B. ..

X. others

1. For matters not covered in this agreement, both parties shall sign a supplementary agreement through negotiation, and the supplementary agreement shall have the same legal effect as this agreement;

2. If there is any dispute in this agreement, Party A and Party B shall settle it through consultation; If negotiation fails, please apply to the people's court where Party A is located for settlement;

3. This agreement shall come into force as of the date of signature and seal by both parties, with a total of * * * pages and two copies.

Party A holds one copy and Party B holds one copy, which have the same legal effect.

Annex I: Schematic Diagram of the Scope of Demolition Contract

Party A: (Seal) Party B: (Seal) Legal Representative: Legal Representative: Tel: Tel:

Date: 20xx Year Date: 20xx Year Date: 20xx Year Date

Article 6 of the House Demolition Agreement Party A: (hereinafter referred to as Party A)

Party B: (hereinafter referred to as Party B)

Party A entrusts Party B to demolish the dangerous building of Grade D in xx Primary School, and through friendly negotiation, both parties sign this agreement, with the specific terms as follows:

First, the scope of demolition:

1. Tear down the kitchen and living room.

2. Building structure: civil structure

3. Demolition scope: the door wall, partition wall and back wall of the house are demolished to be consistent with the partition wall of the playground, and all the house garbage is removed.

2. Demolition time: August 2, 20xx1August 24,.

Third, the quality requirements:

1, more than 0.00 meters, the demolition site is flat, and there is no house garbage.

2. After the construction is completed, Party B shall repair the reserved back wall and cover the back wall and the playground partition with brick caps.

Four. Settlement method: the timber, doors and windows obtained from demolition shall be owned by Party B through negotiation between both parties, and Party A shall pay Party B 200 yuan in cash.

Verb (abbreviation of verb) Responsibilities and obligations of both parties: Party A is responsible for directing house demolition, reaching the boundary, dredging and perfecting, and formulating the site and garbage disposal methods.

During the demolition of intransitive verbs, Party B shall carry out the construction in strict accordance with the construction specifications, and earnestly implement the safety specifications and regulations. Do a good job in on-site safety management, the responsibility lies with people, obey the arrangement of Party A, carry out the construction in strict accordance with Party A's requirements, and report any problems to Party A in time during the construction process and solve them through negotiation.

7. In case of any safety accident during the construction period, all responsibilities shall be borne by Party B. During the construction period, Party B must ensure that the surrounding roads, water and electricity are unblocked and the water and electricity facilities of the school are in good condition. Party B shall take full responsibility for safety accidents.

Eight, Party B must complete the demolition of buildings and accessories within the scope of demolition and site cleaning within four days after the entry into force of this agreement. Be responsible for a fine of RMB Wu Bai Yuan for each day of delay (except for force majeure and natural factors).

Nine. Matters not covered in this agreement shall be settled by both parties through consultation.

X this agreement is made in triplicate, with each party holding one copy.

XI。 Both parties voluntarily sign this agreement, without any regrets, and it will take effect after being signed by both parties.

Party A: (signature and seal) xxx

Tel: xx

Party B: (signature and seal) xxx

Tel: xx

20xx August 2 1