Xinjiang Huadian Changji Thermal Power Co., Ltd. Phase III Project
The third phase project of Xinjiang Huadian Group Thermal Power Plant is located in Binhu Village, Binhu Township, Changji Hui Autonomous Prefecture, Xinjiang. The total investment of the project is 5 billion yuan, covering an area of 1.500 mu, and the planned capacity is 4×300 MW. The air-cooled coal-fired generator set will be built in two phases. After the project is completed, it can provide reliable heating and power supply for Changji New Town and its surrounding urban areas, meet the heating demand of urban development, improve the present situation of scattered urban heat sources and serious pollution, and play a positive role in improving regional environmental quality. At the same time, it is also conducive to optimizing the structure of thermal power supply in Xinjiang and limiting the blind construction of small and medium-sized condensing thermal power units. The coal used for the project is mainly provided by Tunpu Coal Mine, Sulphur Ditch Coal Mine and local coal mines of Shenhua Company. This project is the third phase of desulfurization project for 2×300 MW units. 2×300 MW steam extraction and heat supply air-cooled coal-fired generator set is used for flue gas desulfurization, and limestone/gypsum wet desulfurization process is adopted, and flue gas is discharged from high chimney. Reserve denitration space. The total investment of the project is 200 million yuan.