What are the English documents of the shipping company?

Fuel adjustment fee fuel surcharge

FAF fuel adjustment fee fuel surcharge

Fuel adjustment fee fuel surcharge

CAF currency adjustment fee currency depreciation surcharge

C & ampf cost+freight cost+freight.

CIF cost+insurance+freight cost+insurance+freight.

free on board

CFS (= LCL) container freight station loading.

LCL does not contain the container load of assembled goods.

FCL container yard

FCL whole container of goods.

Desktop release amplifier

Surrendered amplifier

D/O bill of lading small bill of lading

Estimated time of arrival estimated date of arrival

ETD estimated departure time estimated sailing date

FAK freight charges are not included in the project.

IPI inland point intermodal transportation inland point is always transportation.

POA receiving location

Unloading port unloading place

20-foot TEU 20-foot container

FEU foot equivalent unit 40 foot container

Wharf handling fee

T/C(=W/C) dock fee and storage fee

The warehouse charges storage fees.

Non-vessel operating carrier's non-vessel operating business.

Deadline/Deadline Customs Clearance Date

Date of shipment date of shipment

Delivery fee at destination, transportation fee at destination.

PNW Northwest Coast Pacific Northwest American Line

PSW Pacific Southwest America Line Southwest Coast

West coast United States west coast route

East coast American line East coast

MLB xiaolu bridge

All water is transported by sea.

Bill of lading loading bill of lading

S/O shipping order space order

CLP container loading plan container details

Freight prepaid freight prepaid

To pay the freight freight reverse payment

D/A documents are delivered against D/A documents.

Documents against payment

Telegraphic transfer, telex, telegraphic transfer

United States Federal Maritime Commission

International Federation of Transport Associations

GRI General Rate Increase General Freight Increase

Independent action single price adjustment

N.o.r non-operating refrigerated container refrigeration replacement cabinet

Most favorable customer terms

UIFA USD affects freight adjustment USD change surcharge.

W/M weight or size is charged according to weight or size.

cubic metre

Settlement clause of BT berth time terminal

CSE/CRT box/crate/wooden box/wooden sparse box

Freight is not included. Owner's outer bilge settlement clause

The shipowner is only responsible for unloading, not loading.

Terms of FLT full liner transportation-Berth terms

GW gross weight

CW Variable Weight Toll Weight

VOL WT is heavy in volume and weight.

ICD inland container warehouse

The shipowner is only responsible for loading, not unloading.

Motor ship internal combustion engine ship

M/V motor ship internal combustion engine ship

ORC origin charge Guangdong front-end charge

Procter & gamble company. I. club protection and uncertainty club owners' protection and compensation association

PKG package

PLT pallet pallet

Revenue ton freight ton

It is said that the goods are packed inside.

TBA to be notified will be notified later.

The Tbn to be nominated will be specified later.

LIO liner company. Off-berth clause

VOL WT is heavy in volume and weight.

Neutral organization

Demurrage Compensation for Delayed Shutdown

Detention delay fee

Storage fee, storage rent

Packing loading cabinet

devanning

Close the exit

Direct-loading single product name

Oac export surcharge outbound surcharge

PCC Panama Canal Fee

PSS peak season surcharge

ex factory

ex-factory price

Ex-works railway