Guangxi Guiguan Electric Power Co., Ltd. Bailongtan Hydropower Plant

Bailongtan hydropower station belongs to the seventh cascade hydropower station in Hongshui River basin planning. At present, it is the largest bulb tubular unit hydropower station in China, and it is also one of the earliest hydropower stations designed and built with few people on duty in China. The power station was started in February 1993, and six tubular hydrogenerators with a single unit capacity of 32MW were installed. The recently designed annual power generation capacity is 947 million kWh. After the completion of Tianshengqiao I and Longtan Hydropower Station, the annual power generation will increase to12.69 million kWh. By May 1999, all six units of the power station were put into production.