At present, Trina Solar is actively promoting the integration of zero-carbon new energy base and zero-carbon industrial park, and it is expected to complete the construction of zero-carbon system in 2030. Trina Solar is willing to be a pioneer and more willing to be a practitioner.
On the morning of June 20, 2020, Trina Solar Co., Ltd. and Qinghai State-owned Assets Investment and Management Co., Ltd. (hereinafter referred to as "Qinghai State Investment") jointly developed Hainan 100 MW photovoltaic bidding power generation project in Qinghai Province. The project is located in the photovoltaic park in * * county, Hainan, covering an area of 2,663 mu, with a total installed capacity of 100 MW. Trina Solar PERC single crystal high efficiency module, series inverter and fixed adjustable bracket are selected. After the project is completed, it will make positive contributions to the optimization of Hainan's energy structure and sustainable economic and social development. It is estimated that the average annual power generation will reach 65.438+0.8 billion kWh, which will save about 57,000 tons of standard coal and reduce carbon dioxide emissions by about 6.5438+0.83 million tons each year. Zhang Zhenfei, deputy director of Hainan Development and Reform Commission, director of National Green Industry Development Park Management Committee and director of National Energy Administration, Du Dongya, general manager of system integration of Trina Solar Co., Ltd., and Geng Shuqiang, deputy general manager of Qinghai Green Power Generation Co., Ltd. attended the groundbreaking ceremony.