Brief introduction of SDIC Jincheng energy investment co., ltd

Among them, the first phase of Jincheng Thermal Power Plant has a total investment of 3 1 100 million yuan to build a 2×300MW air-cooled heating unit. Upon completion, the annual power generation will be 3.4 billion kWh, the annual heating will be 5.4 million Ji Jiao, and the heating area will reach 1 1 10,000 square meters, which is a key project in the 11th Five-Year Plan. The current project is # 65438+. The design and production capacity of SDIC Jincheng Energy Bi Li Mine Project is 4 million tons/year, the mine field area is 434 15 square kilometers, the No.3 coal reserve is 320.43 million tons, and the total project budget investment is 3.28 billion yuan. The preparatory work before the project approval has been basically completed and has been submitted to the National Development and Reform Commission for approval. Construction is expected to start in 2065, 438+03. The annual water supply scale of SDIC Jincheng Tan Wei Hydropower Project is 20.2 million M3, and the average power generation for many years is 610.3 million kw·h, which has entered the final stage of the project. At the same time, the company is actively promoting the second phase of thermal power and the preliminary work of coal-to-methanol and olefin chemical projects, and making every effort to build a circular economy industrial chain of "coal, electricity, water and chemicals".