Before ordering radiators, we should first know the installation location of the radiators we ordered and the basic distance between the radiator inlet pipe and return pipe. After knowing the bottom spacing of the radiator, we first cut off some unnecessary ones according to the order height, leaving the direction of entering and leaving the nozzle.
punching
After the radiator arrives home, we need to know the approximate location of the radiator and the location of the accessories hanging on the solid wall. This requires us to first point out the installation position of the radiator and place symbols where it needs to be fixed. After the symbol is completed, we can directly drill holes to determine the installation position of the pipe fittings.
Hang radiator
Make a hole to fix the pendant, first put the radiator on the wall, adjust the distance between the cut-off water inlet pipe and return pipe, and make sure that the radiator is in the right direction on the wall.
4. A set of buttons
Fix the direction of the radiator, and we can fix the pipe. The main function of the sleeve fastener is to install the connecting parts between the main pipe and the radiator. Usually, the diameter is variable and the threads are aligned.
take over
We can start connecting the radiator by matching the matching thread with the radiator diameter. Determine the installation direction of the radiator, add elbows or straight pipes, add gates, and connect the inlet nozzle and return nozzle of the radiator.
6. Boiling water debugging
After all the installation procedures are completed, we can open the inlet valve and the return valve to see if the water flow circulates smoothly.
7. The radiator has been installed.
The installation method of radiator has been explained in detail. You can try to install radiators at home yourself. If you are busy with your homework, you can also ask professionals to help you install it.
8. Acceptance
The owner accepted the whole radiator system. Usually, during replacement construction, workers will reserve valves on the pipeline. After installation, a stamping test should be conducted to prove that there is no operation and no leakage, and then the acceptance can be completed.