What are the budget lists for all-inclusive renovation?

With the development of society and the continuous improvement of economic living standards, most people buy and build new houses, which is also an important part of new house decoration. Some people choose an all-inclusive company, and then the all-inclusive company will make a list of all-inclusive budgets for the owners. Bian Xiao will introduce you to the all-inclusive budget list of the renovation and the steps of the renovation process.

1. What are the budget lists for all-inclusive renovation?

1. All-inclusive budget list for decoration, floor and laminate flooring: low-end 30-70 yuan/square, middle-end 80-11square, good 120- 150/ square, good hundreds. Calculation method of building area in block letters: 0.9 in the suite is the actual usable area (excluding balcony).

2. All-inclusive budget list of decoration, solid wood floor: it is not recommended to use solid wood below 200. Generally, the specials of Nature and Anxin are around 250. The middle price is more than 300, and the good ones are thousands. 1-3% loss.

3. All-inclusive budget for decoration, living room tiles: low-end 20-80/ square, middle-end 80- 150/ square, 160-280/ square, with a good price of more than 400. Sometimes, a good brand of special brick is a good choice if the color is right. When calculating this, you need to calculate the skirting line at the same time

4. Budget list of all-inclusive renovation, balcony brick (or anticorrosive wood): recommended, generally 20.30 yuan is enough, and it is best not to exceed 60.70 yuan, which seems to be 100-200 yuan/square.

5. All-inclusive budget list for decoration, kitchen wall tiles: small tiles are more expensive, and the wages for diagonal stickers are also more expensive. Some need antique small tiles, but the budget is tight, which can be solved by drawing grooves with large tiles. Low 10-40 yuan? , mid-range 40- 100 yuan, high-grade 100-300 yuan, the calculation is generally more than 4 times the ground area. Sometimes when the color is worthy, the special price of the brand is a better choice. ? You can stick it on the back of the cupboard and keep it. Don't cut the budget at this time. Usually all the savings are gone.

6. All-inclusive budget list kitchen cabinet renovation: no specific budget is not good. According to the size and requirements of the house, the brand, configuration and shape are generally 2000-8000 yuan, or tens of thousands or even hundreds of thousands.

Second, the decoration process steps

1, main body demolition and reconstruction The main body demolition and reconstruction is the first project, which mainly includes wall demolition, wall building, wall covering, heating demolition and replacement of plastic steel windows. Demolition of garbage should be cleared out in time to ensure indoor cleanliness and facilitate future construction.

2, hydropower transformation Before the hydropower transformation, the cabinet designer should make the first measurement to help determine the accurate position of switches, lamps, basins, bathtubs, washing machines, etc. , and make the transformation plan. You'd better send someone to the water heater to design the position of power supply and interface according to the model you choose. The air conditioner and its power supply should be placed on the wall of the bedside as far as possible to avoid the air conditioner blowing directly at people in the future.

Sticking wallpaper is much better than painting the wall. After the wall paint has been painted, the oil trade union will brush nitrocellulose paint where wallpaper needs to be pasted. When the paint is dry the next day, you can paste the wallpaper.

4, install the socket panel The socket panel can be installed in about half a day. It should be noted that it is best to buy sockets with switch function, especially in the kitchen, so that you can control the rice cooker and microwave oven without plugging and unplugging the power supply.

5. Installing cabinets is a coordinated project. You should buy a range hood, cooker and sink in advance. It is best to deliver the goods on the same day and install them at the same time as the cabinets.

6. Install the finished door. The finished door should be installed before the floor installation. Mainly because the door installation steps are complicated, hinge, lock, door suction, door frame and so on. There are many tools used, such as installing the floor first, so it is difficult to avoid bumping.

The above is a detailed introduction to the budget list of all-inclusive renovation in Bian Xiao, as well as detailed answers to a series of related questions such as renovation process steps. I believe everyone has a certain understanding of the problem of house decoration, and I hope it will help you here.