2. Zhenhai Waste Incineration Power Plant
Zhejiang Zhenhai Power Generation Co., Ltd., formerly known as Zhenhai Power Plant, was restructured into a limited liability company according to the requirements of modern enterprise system at the end of 1999, and was owned by Zhejiang Energy Group Co., Ltd. in March 2003. The original Zhenhai power plant project is a key construction project approved by the State Planning Commission and the Ministry of Water and Electricity during the Sixth Five-Year Plan and the Seventh Five-Year Plan. The whole project broke ground in March of 1977, and was completed and put into operation in June of 1990, with a total installed capacity of 1050mw, including 2 oil-fired generators of 125mw and 4 coal-fired generators of 200mw. Zhenhai Power Plant is the first large-scale thermal power plant with an installed capacity of more than one million kilowatts in Zhejiang Province, and it is also one of the main power plants in East China Power Grid, belonging to a national first-class enterprise. At the end of 2003, two original 125mw oil-fired turbine-generator sets were demolished by the first explosion in Asia, and two 350mw gas-steam combined cycle generator sets were under construction.
Zhenhai Waste Incineration Power Plant is located in Zhenhai Chemical Industrial Zone. The garbage incineration power plant of Ningbo Zhongke Green Power Co., Ltd. officially started construction in June 65438+1October 65438+February 2005, covering an area of 7 1.04 mu, with a total investment of 220 million yuan, mainly including two incinerators with a daily processing capacity of 300 tons and two generator sets. In the process of construction, the circulating fluidized bed waste incineration power generation technology and equipment with independent intellectual property rights of Chinese Academy of Sciences can realize the "reduction, recycling and harmless" treatment of domestic waste and turn waste into treasure for power generation. After the completion of Zhenhai Waste Incineration Power Plant, it will handle 600 tons of domestic waste every day and 240,000 tons of domestic waste every year, generating 65.438+0.5 billion kWh of electricity.