The mine was built in June of 20 12, and was basically completed at the end of 20 14, and entered the stage of joint trial operation. 20 15 years, each single project will be completed and accepted, and the comprehensive acceptance will be completed and put into production by the end of the year. At present, the main coal seam is Jurassic 5- 1 coal, and advanced longwall comprehensive mechanized coal mining and comprehensive mechanized tunneling technology are adopted. Excellent coal quality, which is good power coal and gasification coal; It has the characteristics of high calorific value, low ash, low sulfur and low phosphorus; It is a typical "environmental protection coal" in Yulin.
The company is a joint-stock private enterprise invested by Fugu Zhongyuan Industrial Co., Ltd. and Fugu Senyuan Asset Management Co., Ltd., each with 50% capital contribution, including production technology department, safety and environmental protection department, mechanical and electrical equipment department, financial management department, sales and operation department, enterprise management department, comprehensive office, dispatching room, fully mechanized mining team, driving team 1, driving team 2, preparation team, electromechanical operation team, machine maintenance workshop, coal preparation workshop, etc. At present, there are 350 employees, 80 managers and various engineering and technical personnel, with engineers or above 19, all of whom graduated from major professional colleges in coal mines and have certain post recognition experience.
draw
From the beginning of construction, the mine has adhered to the management concept of "science, pragmatism, innovation and integrity"; According to our company's operating characteristics and resource capacity, according to the idea of overall planning, segmented implementation and continuous improvement; Pay attention to infrastructure construction, safety first, quality clearance and cost control; Implement the standardization of operation procedures, post responsibilities, standards and quantification of work; Strive to build the mine into a modern, mechanized, standardized and information mine with safety, environmental protection, energy saving and high efficiency.
draw
Yi 'an Mining Area Exhibition
The annual output of Fugu Nengdong Coal Mine is 80 million tons. According to the relevant public information, we will strengthen the structural reform of the supply side of coal resources, give full play to the advantages of Fugu coal, go all out to promote the increase and upgrading of coal resources, and urge Shenlongsi coal mine to enter the joint trial operation, so as to stabilize the raw coal output at about 80 million tons.