Project advantage
1, the location is superior. The project is located in Nansha main road, with China Railway Construction South Headquarters Base, close to Nansha District Government, and about 700 meters away from Jiaomen Station of Metro Line 4, so it is convenient to drive or take the subway.
2. Cooperate with the decoration and delivery when selling the building, and save the decoration cost.
3. At present (20 18.7. 15), there are 36-square, 66-square flat-floor and duplex apartments, and the prices are lower than those of foreign houses.
4. The height of duplex apartment is 5m, which is higher than other apartment projects, and the utilization rate is high.
Project disadvantage
1, the payment method is not flexible enough, and it is necessary to prepare all the house payment in a short time.
2. There is no mezzanine when the duplex unit is delivered, and it needs to be designed and decorated by itself after delivery.
Generally speaking, the Global Center has a superior geographical location, comfortable environment and high brand awareness, but the payment method is not flexible.