Relevant ideas of installation company of China Construction Fifth Division

First, profound management accumulation and advanced management concepts. The company's basic strategy: professional development, regional operation and refined management; Under the mainstream culture of "trust and harmony" of China Construction Fifth Bureau, an installation culture with the characteristics of our installation company has been formed: paying attention to integrity, details and pursuing perfection; Good sense of service: be grateful to service owners and suppliers.

The company took the lead in passing the certification of comprehensive management system in Hunan Province. The implementation of an integrated management system with one management manual and eight management volumes has effectively realized the intensification, process and standardization of company management.

The second is quality and brand advantage. The company has been successively rated as the national excellent construction enterprise, the 3A credit enterprise in Hunan Province, the unit of honoring contracts and keeping promises in Hunan Province, and the home of model workers in Hunan Province. He was awarded the 3A credit rating of construction enterprises and banks, and successively won eight Luban Awards, two Zhan Tianyou Civil Engineering Awards, two national quality engineering awards and dozens of provincial excellent engineering awards.

The third is the advantage of professional technical ability. The company has abundant talents and technical strength. The company has more than 800 managers, including 363 middle and senior engineers, 70 first-class registered construction engineers, 3 certified public accountants, and 15 certified cost engineers, and 12 won the title of "National Excellent Project Manager". In terms of construction technology and management, there is a good talent pool, which has laid a good foundation for completing the project.

Fourth, there is a management advantage characterized by outstanding resource allocation ability. Group operation: the company implements group operation, enjoys resources and uniformly allocates people, money and materials. Therefore, the corresponding factor management department has been established to provide a perfect support and guarantee system for the implementation of the project; Standardized and intensive management: the company uses the advantages of the group and scale to implement intensive management, centralized management and unified deployment of main materials, labor and financial funds, so as to reduce the project cost, thus ensuring the implementation of the company's competitive strategy of "low-cost competition and high-quality management"; Integrate and standardize the management processes of various disciplines to achieve standardized management.

Fifth, it has the advantages of engineering construction based on the management ability of electromechanical general contracting. The company has strong electromechanical general contracting management ability, and has undertaken a large number of electromechanical installation projects successively, such as Shanghai Lujiazui Financial and Trade Zone, land plot, Beijing Xizhimen Xihuan Plaza shopping mall renovation project, Beijing Great Wall Hotel electromechanical renovation and installation project, Jinhuang subway plaza electromechanical project, Shenyang Zhongjie Plaza electromechanical project, Shenzhen Zhonghang Plaza, Shenzhen Xinghe Development Center electromechanical installation project, Chongqing Metropolitan Plaza electromechanical installation project, etc. As an important force in urban construction, the company has built a large number of influential engineering projects all over the country for more than 50 years with its complete professional categories, excellent technical equipment and strong construction force, which has enriched the company's construction experience in electromechanical installation general contracting, industrial equipment installation, municipal public works and high-rise steel structure safety engineering.

Sixth, the advantages of foreign-funded project construction management experience. In recent years, through our long-term cooperation with design consultants such as Hutchison Whampoa, Hang Lung Group, Sun Hung Kai Property Group, Shimao Group, Shui On Group, Dali Group, Changsheng Group, Singapore Kaide Group, Malaysia Success Group, South Korea Samsung, Korea Hankook Tire, and estimation consultants such as Asia Baicheng, Bamadana, Lixin, Arup, Qianjin and Hu, the company has trained a number of foreign-funded enterprises and large-scale project operations. It has also formed a good atmosphere of quick response from top to bottom and handling affairs according to international practices, further facilitating mutual communication, strengthening the behavioral awareness of all employees to serve the owners first, and cultivating and improving the project management level.