Demonstration contract of house demolition project?

Employer of House Demolition Contract (hereinafter referred to as Party A): Contractor (hereinafter referred to as Party B): In accordance with the Contract Law of People's Republic of China (PRC), Regulations on Construction and Installation Projects, Regulations on Construction Projects Contracts and other relevant laws and regulations, and following the principles of equality, voluntariness, fairness, honesty and credibility, both parties reached an agreement on matters related to labor services during the construction of this project through consultation. The following agreements are reached: Article 1: Project overview, project name, project location and project content Article 2: Contract scope and all buildings within the scope (see attached drawings for details) Article 2: Demolition of the houses listed in the appeal to the terrace, and demolition to the outdoor terrace is zero. Article 3: Construction period, mobilization date, completion date, completion date, year, month, day and day. In order to make the demolition project go smoothly, Party A shall deliver% of the total demolition amount to Party B within one month after the signing of the contract,% of the total demolition amount to Party B within two months, and the remaining demolition amount shall be delivered to Party B before. Article 4: Contract price, payment and settlement of project funds 1. Pay RMB/_ yuan to Party A. 2. From the date of signing this contract, Party B shall pay Party A the first demolition payment of RMB10,000.00 yuan. 3. When the project progress reaches%, the remaining buildings to be demolished shall be delivered to Party B before. Article 5: Responsibilities of both parties. Responsibility of Party A: 1. Be responsible for cutting off the water, electricity, gas and communication of the demolished houses. 2. Cooperate with Party B to coordinate all aspects. 3. Ensure the integrity of the buildings and structures to be demolished. 4, responsible for the supervision and inspection of the demolition of the construction site. 5. Responsible for the acceptance of demolition plots. Two. Responsibility of Party B: 1. Enter the demolition site on time according to Party A's requirements to ensure the smooth completion of the construction period. 2. Be responsible for the demolition, removal and cleaning of all buildings and accessories listed in this agreement. 3. All responsibilities and expenses such as accidents and administrative penalties caused by Party B shall be borne by Party B itself. 4. Prepare the demolition environmental protection scheme and safety construction scheme, adhere to civilized construction at the demolition site, arrange personnel to clean up the roads in and out of the construction site in time, and pile up recycled materials in strict areas. It is forbidden to pile up any materials on roads and passages. Article 6: Liability for breach of contract 1. Party A delivers the construction site according to the time stipulated in the contract, and if Party B fails to complete the demolition task according to the time stipulated in the contract, it will be fined 5,000 yuan/day for each day of delay. Article 7: Safe construction 1. Party B shall take strict safety protection measures in accordance with relevant regulations, and bear the responsibility for accidents caused by its own ineffective safety measures and the expenses arising therefrom. Second, machinery and personnel should be insured before entering the site. The insurance premium is considered in the quotation, and Party A will not pay it separately. Party B shall abide by all rules and regulations of the construction site, and be responsible for all safety accidents caused by Party B.. In case of major accidents, Party B shall immediately report to relevant departments and notify Party A's representative according to relevant regulations. At the same time, according to the relevant requirements of the government. 4. Before Party B starts construction in power equipment, high-voltage lines, underground passages, inflammable and explosive areas and near main streets, Party A shall arrange professionals to cooperate. Article 8: In case of any dispute between Party A and Party B, it shall be settled through consultation for the purpose of friendly cooperation. This contract is made in quadruplicate, each party holds two copies, and the signature and seal have the same legal effect. Date of conclusion of the Contract: MM DD YY Employer: Contractor: Address: Address: Legal Representative: Legal Representative: Entrusted Agent: Entrusted Agent: Tel: Tel: