Brief Introduction of Shandong Branch of huadian power international Electric Power Co., Ltd.

Huadian power international Shandong Branch is entrusted by huadian power international Company to manage 10 power plants with an installed capacity of13,049,500 kilowatts, accounting for 19.9% of the total installed capacity in Shandong Province. Two power projects in Jianhua are 2.6 million kilowatts (2× 300,000 kilowatts in Zibo and 2× 1 10,000 kilowatts in Laizhou), and there are docks and railway projects under construction 1 unit; Two railway thermal power projects (the first unit of Qingdao Phase III 2× 300,000 kW project and the first unit of Shiliquan expansion 2× 600,000 kW project). The enterprises in operation are: Zouxian Power Plant (4.54 million kilowatts), Weifang Company (2 million kilowatts), Qingdao Company (65438+200,000 kilowatts), Laicheng Power Plant (65438+200,000 kilowatts), Centennial Power Company (1.46 million kilowatts, including Donghai Thermal Power) and Tengzhou Xinyuan Company (. At present, huadian power international Shandong Branch is the second largest power generation company in Shandong Province, with 40 thermal power units in operation and 26 units above 300,000 kilowatts, * * *108,000 kilowatts, accounting for 83.38% of the total capacity. The total installed capacity of the company's nine power plants is 6.5438+03.009 million kilowatts, accounting for 30.654.38+07% of the total capacity of public units in the province.

Huadian power international Shandong Branch actively promotes "small enterprises" and energy conservation and emission reduction, and strives to build a resource-saving and environment-friendly enterprise. Since 2007, the demolition of small thermal power units in Xinyuan, Zibo, Qingdao and Shiliquan power plants in Tengzhou has been organized and implemented successively, and a total of 13 small thermal power units have been shut down, accounting for 875,000 kilowatts. Actively implement desulfurization technical transformation project, and all units of Huadian Shandong 10 power generation enterprise have completed desulfurization transformation.