After friendly negotiation between Party A and Party B, Party A decided to entrust Party B to decorate the house and signed this agreement for both parties to abide by.
1. Project location: Room 40 1, Building G, residential area in _ _ _ county.
Form and structure: single floor, three bedrooms, two halls, one kitchen and two bathrooms
Three. Duration: one and a half months (45 days) from the commencement date.
Fourth, the way of contracting:
Part of the materials are contracted by Party B, and part of the materials are provided by Party A (see Schedule 1: List of Decoration Materials Provided by Party A for details). Schedule 2: List of Decoration Materials Provided by Party B)
Verb (abbreviation for verb) item:
1. Party B is responsible for laying tiles, laying corner lines and leveling the floors of five rooms (three bedrooms, one living room and one living room); The top of a kitchen and two bathrooms are covered with porcelain, leaving room for the ceiling and polishing the corners. Tiles shall be provided by Party A, and other materials shall be provided by Party B. ..
2. Party B is responsible for the circuit waterway reconstruction;
3. Party B is responsible for the integrated ceiling: kitchen and two bathrooms.
Step 4 Pack three water pipes
5. Party B is responsible for plastering the top of the living room and the top of the living room corridor. Materials shall be provided by Party B. ..
6. The wall should be coated with double lime powder. Party A shall provide paint materials, and Party B shall be responsible for the rest.
7. Party B is responsible for installing two bathroom door, lamps and sanitary ware, and the materials are provided by Party A. ..
8. After the renovation is completed, Party B shall be responsible for cleaning up.
9. The specific decoration of kitchen cabinets shall be proposed by Party A and determined through negotiation.
10. For other unfinished details, Party A shall propose a scheme and determine it through negotiation.
Supply of intransitive verb materials and equipment
1. The materials and equipment provided by Party A shall be qualified products that meet the requirements of design and national standards, and shall be supplied to the site in time according to the construction schedule, and Party B shall be notified in advance. Both parties shall accept the quantity and appearance of the supplied materials, and Party B shall be responsible for keeping them after handling the handover procedures.
2. The materials supplied by Party A shall not be used for other purposes without Party A's consent. If Party B misappropriates the materials, it shall compensate Party A at twice the price of the misappropriated materials.
3. The materials and equipment provided by Party B must conform to the varieties, specifications, models, quality, measurement standards and quantity in the list of materials provided.
4. If the materials and equipment provided by Party B do not meet the quality requirements of national standards or have different specifications, it is prohibited to use them; If it has been used, the consequences and losses shall be borne by Party B. ..
Seven, quality standards
The construction quality shall meet the safety requirements, and the decoration quality shall not be lower than the decoration standard of the same building type, which shall be approved by both parties. After the project is completed and accepted, if there are quality problems in Party B's construction within 3 months, Party B shall be responsible for rework and maintenance for free.
Eight, the project cost
Party A * * * pays Party B *** 15600 yuan for the decoration labor and materials.
Nine, the project payment is paid in the following ways:
(1) Party A shall pay 20% of the total price (3120 yuan) 2-5 days after the signing of this contract;
(2) Within three days after 50% of the engineering quantity is completed, Party A shall pay the engineering quantity equivalent to 40% of the total price (6240);
(3) Within three days after the completion acceptance, Party A shall pay the project payment equivalent to 40% of the total price (6240).
(IV) After one year of completion acceptance or the expiration of the warranty period agreed by both parties, if there is any quality problem in the decoration, Party B will check for Party A free of charge, otherwise, the damaged amount will be refunded!
X this agreement is made in duplicate, one for each party, with the same effect. This agreement shall come into effect as of the date of signature by both parties.
Party A: Party B:
Signature (seal): Signature (seal):
Tel: Tel:
Year, month, sun, moon, sun.
Electronic contract for interior decoration II
Employer (hereinafter referred to as Party A):
Name:
Contact number
Contractor (hereinafter referred to as Party B):
Name:
Project leader:
Contact number
According to the Economic Contract Law of the People's Republic of China and other relevant laws and regulations, Party A and Party B have reached the following agreement on the renovation project on the basis of equality, voluntariness and consensus:
1, project site
2. Project contracting method: contracting for work and materials.
3. The construction period is _ _ _ _ days.
Commencement date _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Completion date _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
4. Both parties agree that the price of this project is RMB (in words) _ _ _ _ _ _ _. Down payment, second payment.
5. After the project is completed, Party B shall notify Party A for acceptance. Party A shall organize acceptance within two days after receiving the acceptance notice, and fill in the project acceptance form. After the project payment is settled, the handover formalities shall be handled.
6. This project is guaranteed for one year from the date of acceptance and signature by both parties. After acceptance and signature by both parties, fill in the project warranty.
7. After the acceptance of the project, Party B proposes the project settlement to Party A, and sends relevant materials to Party A. If Party A has no objection within the day after receiving the materials, it will be deemed as agreement, and both parties will fill in the project description and sign it.
8. If either party fails to perform the contract or violates national laws and regulations and relevant policies of this Municipality, and is fined or causes losses to the other party, the responsible party shall bear the responsibility and compensate the losses caused to the other party.
9. If the contract cannot be continued due to one party's reasons, that party shall promptly notify the other party and go through the contract termination procedures, and the responsible party shall compensate the other party for the corresponding losses.
10. This contract shall come into effect after being signed (sealed) by both parties.
1 1. If Party A and Party B sign this contract directly, this contract shall be made in duplicate, with each party holding one copy.
Party A: Party B:
Tel: Tel:
date month year
Electronic Indoor renovation contract 3
Client (Party A): Organizer (Party B):
I. Project Location: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Two. Form and structure: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
3. Project: (attached with construction description, construction drawing and project quotation). .
4. Contracting method: Party B contracts the construction and auxiliary materials and Party A provides the main materials (see the list of materials provided by Party A).
Verb (abbreviation of verb) quality standard: the construction quality meets the safety requirements, and the decoration quality is not lower than the decoration standard of the same building type. Both parties agree that the Code for Quality Acceptance of Building Decoration Engineering (GB 50210-_ _) is the minimum standard for quality evaluation; The indoor environmental standards are 10 mandatory national standard for the limit of harmful substances in building decoration materials and the indoor environmental pollution control standard for civil construction projects.
Intransitive verb contract sum: (in words) _ _ _ _ _ _ _ _. After the review is completed, it shall be settled according to the facts □; The contract payment is a one-time payment.
Seven. Payment method: after the contract is agreed, Party A shall pay 35% of the project price in advance _ _ _ _ _ _ _ _; Pay 40% of the project cost _ _ _ _ _ yuan after the concealed works such as water and electricity are qualified; Pay 20% _ _ _ _ _ yuan after the acceptance of the bricklayer's carpentry intermediate project, and pay the balance of 5% _ _ _ _ _ _ yuan within 5 days after the project completion acceptance.
Eight. This agreement is made in duplicate, each party holds one copy, which has the same effect. This agreement shall come into effect as of the date of signature by both parties.
Party A: Party B:
Tel: Tel:
date month year
Electronic Indoor renovation contract 4
Owner (hereinafter referred to as Party A):
Contact telephone number:
Construction Team (hereinafter referred to as Party B):
Contact telephone number:
ID number and copy
Project: bedroom decoration
After many friendly consultations between Party A and Party B, Party A decided to entrust the right to decorate the living room to Party B. In order to ensure the smooth progress of the project, this contract (including its annexes and all supplementary contracts) is specially signed in accordance with relevant national laws and regulations for * * * to abide by.
I. Overview of the Project
1, project address:
2. Living room specifications: bedroom, kitchen and bathroom.
Total: square meters of construction area;
3. Construction content: For details, please refer to Annex (1) Detailed Drawing of Home Decoration Construction Project and House Type Construction Drawing.
4. Entrustment method:
Second, the project price
Package clearing fee: RMB, in words:
Three. terms of payment
1, the construction team enters the site, and the living expenses are prepaid: RMB,
2, plumber completed, salary yuan.
3. After carpentry is completed, the salary is RMB.
4. Pay RMB when the bricklayer finishes.
5, project completion, pay RMB,
6. In the process of project construction, if there is any increase or decrease of the project or need to be changed, the increase or decrease of the project price shall be settled after the completion of the increase or decrease of the project through consultation between Party A and Party B. ..
7. The project quality warranty is RMB Yuan, from the date of completion 1 year later.
8. If all the acceptance items meet Party A's acceptance standards and are satisfactory when the project is completed, Party A will pay Party B an additional project award fund.
Fourth, design.
1. If Party A has drawings, it shall provide Party B with a set of drawings and be responsible for disclosure;
2. If Party A has no drawings, it shall clearly explain the requirements to Party B, and Party B shall draw a sketch for Party A's approval before construction.
Verb (abbreviation of verb) material
1. Party B shall provide Party A with a list of materials to be purchased three days in advance, and Party A shall timely purchase materials for use by the construction team within four days. Both parties shall bear their respective responsibilities for the delay in construction period and economic losses.
2. All building materials provided by Party A shall be kept by Party B after acceptance, and shall not be used for other purposes without Party A's consent; If Party B uses it for other purposes or keeps it improperly, it shall compensate Party A at twice the actual price of the materials.
3. Without the consent of Party A, Party B shall not purchase materials by itself; If it has been purchased, Party A has the right to refuse to use it unconditionally, and may refuse to pay the cost of the materials.
4. If Party B needs to purchase some materials, Party B shall purchase them at the building materials supply point designated by Party A and issue an official invoice.
5. Party B shall check and accept the quality of building materials purchased by Party A, and raise quality problems with Party A in time, and have the right to refuse to use them. If Party A insists on using it, it shall request Party B in writing and bear the losses caused by the quality of the materials.
6. Party B shall assist Party A to receive the goods and check the accuracy of the quantity and accessories.
7. Party B shall properly keep the materials and prohibit other personnel from entering the site.
8. Without Party A's permission, Party B shall not take any building materials out of the house. If such a phenomenon is found, it will be deducted from the labor cost by doubling the material price.
Six, time limit for a project and project quality inspection and acceptance
1. The construction period is days, from MM DD YY to MM DD YY. If the construction period is delayed due to Party A's reasons, the construction period will be postponed; If the construction period is delayed due to Party B's factors, Party A may deduct Party B's labor cost of 50 yuan/day.
2. During the construction period, Party B's daily working hours are: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
3, engineering quality inspection and acceptance
A, the basis of engineering quality evaluation and acceptance criteria:
(1) Construction drawings, practices and design changes;
② Code for Construction of Residential Decoration Engineering
(3) Quality Acceptance Standard for Urban Family Room Decoration Project
B. Process acceptance items: foundation reconstruction project, water and electricity line reconstruction project (before closing), waterproof project (before tile laying), ceiling project (before plasterboard coating), door and window project, joinery project and wall coating project;
C. Acceptance items confirmed by both parties; Unqualified items should be rectified within a time limit and accepted separately until they are qualified.
Seven, material processing
Party A's materials are delivered to the downstairs where the project is located, and any construction personnel of Party B shall carry them unconditionally.
Eight, garbage removal
1, garbage bagging;
2. Garbage should be cleaned up every day;
3. The garbage shall be transported by Party B to the garbage dump designated by the property. 、
Nine. Labor force management
1. Party B shall provide Party A with copies of ID cards of all construction personnel before the commencement of construction;
2. Without Party A's permission, off-site construction personnel shall not spend the night at the site;
3. Party B's temporary residence permit in Changsha is complete, and relevant losses caused by incomplete documents shall be borne by Party B;
4. Without the consent of Party A, Party B shall not change the construction personnel at will;
5. Without the consent of Party A, Party B shall not stop work or go slow under any circumstances.
X. Construction machinery and tools
Party B shall bring its own tools needed for construction, and ensure the safety and good usability of the tools, and the maintenance expenses of the tools shall be borne by Party B..
XI. On-site management
1, open flame is strictly prohibited at the site;
2, paint materials must be placed separately from other materials.
Twelve. maintain
1. Quality problems caused by Party B's construction,
Party B shall maintain it free of charge within two years.
2. For general maintenance, Party B shall carry out maintenance within three days after Party A notifies Party B, and for special cases (water and electricity problems), Party B must arrive within 24 hours to carry out maintenance.
3. If Party B fails to complete the maintenance in time as agreed in the contract, Party A can arrange other construction teams to carry out the maintenance work, and the labor costs incurred will be deducted from the project warranty fund.
Thirteen. Annex to the contract
1, details of construction contents, items and expenses.
Fourteen dispute over a contract
1. In case of any dispute, Party A and Party B shall settle it through negotiation first.
2. If negotiation fails, a lawsuit can be brought to the court where the dispute is located.
Fifteen. Other instructions and requirements:
1. The pipeline to be concealed shall be concealed after Party A's acceptance, and Party A shall be provided with the as-built drawings of indoor water and electricity pipelines before the completion acceptance.
2. In addition to the above decoration requirements, if there is any extra work, both parties shall negotiate separately, and the construction cost shall not be higher than the average level of the same kind.
3. This project is a package settlement, and Party A only provides materials. Construction tools and other equipment shall be provided by Party B's construction contractor.
4. Party B's construction unit must ensure the construction quality. Found that the construction quality problems, the construction unit shall promptly correct. If quality problems are found during the completion acceptance, the construction unit shall immediately rectify them, and Party A has the right to refuse to pay the labor costs before Party A's rectification requirements are met.
5. Party B appoints (name) as the on-site representative of Party B to be responsible for the performance of the contract, organize the construction according to the requirements of the contract, and complete the construction task on time with good quality and quantity.
6, the construction personnel to civilized construction, barbaric construction is prohibited. 、
7. The construction unit is responsible for cleaning up the construction waste to the designated place in time. After the construction, the construction personnel are responsible for clearing the construction waste at the site, and can leave the site immediately after the completion.
8. Party B shall strengthen the safety education on fire prevention and theft prevention for on-site construction personnel. Construction personnel are not allowed to violate the law and discipline at the construction site, and the consequences will be at their own risk if problems arise.
9. Supplementary provisions
① This contract is signed by Party A and Party B in duplicate, with each party holding one copy. This contract shall come into effect after being signed (sealed) by both parties.
(2) after the signing of this contract, the project shall not be subcontracted.
(3) After the project is completed, the contract will be automatically terminated.
(4) The annexes to this contract are an integral part of this contract and have the same legal effect as this contract.
Party A: Party B:
Signature: signature:
Date of signing: Date of signing:
Electronic contract for interior decoration 5
Customer (Party A):
Organizer (Party B):
Engineering project:
Through friendly negotiation between Party A and Party B, Party A decides to entrust Party B to decorate the living room. In order to ensure the smooth progress of the project, in accordance with relevant national laws and regulations, this contract (including its annexes and all supplementary contracts) is hereby signed for * * * to abide by.
Article 1: Project Overview
1. Project address: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
2, room specifications:
Total: the construction area is _ _ _ _ _ _ _ _ square meters.
3. Construction content: See Annex (1) List of Home Decoration Construction Contents and Construction Drawings for details.
4. Project Commencement Date: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
5. Project completion date: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Total days of the project: _ _ _ _ _ _
Article 2: Project Price
The project price (in words) is _ _ _ _ _ _ _ _ Yuan (in words).
Article 3: Quality Requirements
1. The varieties, specifications and names of the main materials used in the project shall be approved by both parties. See Annex (III) List of Final Accounts of Home Decoration Engineering Materials for details.
2. Regarding the acceptance standard of this project, both parties agree to refer to Zhejiang local standard "Acceptance Standard for Residential Decoration".
3. In the process of construction, if Party A has special construction projects or special quality requirements, both parties shall sign a supplementary contract for the increased cost.
Article 4: Method of Payment
1. After the contract is signed, Party A shall pay 100% of the project cost and 50% of the project cost; When the progress of the construction period is over half (year, month and day), Party A will pay 40% of the project payment for the second time. The remaining 10% shall be paid to Party A after the project is completed and accepted. (Note: Construction costs include labor costs)
Party A pays off the project price, and Party B issues a unified invoice, handles the handover to Party A, and issues a decoration project warranty card.
Party A's failure to pay on time is a breach of contract, and Party B has the right to stop the construction. If the project price is not settled after acceptance, it shall not be delivered for use.
2. If there is any increase or decrease in the project or need to be changed during the project construction, both parties shall sign a supplementary contract, and Party B shall issue a construction change form and notify the person in charge of the construction site. Increase or decrease the project price and settle on the spot.
3. If Party A fails to prepay the project price within the time limit stipulated in this contract, Party A shall pay 1% of the unpaid project price to Party B for each day overdue.
4. If Party A mortgages the house decoration to the bank, it shall hand over the mortgage certificate and relevant documents (copies) to Party B. ..
Article 5: Liability for breach of contract
After the contract comes into effect, during the performance of the contract, the party that terminates the contract without authorization shall pay the other party 5% of the total contract amount as liquidated damages. If the actual loss caused to the other party by the unauthorized termination of the contract exceeds the liquidated damages, it shall be compensated.
Article 6: Modification and Termination of the Contract
1. After this contract comes into effect after being signed by both parties, both parties must strictly abide by it. If either party needs to change the contents of the contract, it shall sign a supplementary agreement after both parties reach an agreement through consultation. If it is necessary to terminate the contract, the party who proposes to terminate the contract shall do so in writing, and pay a penalty of 65,438+00% of the total contract price, and go through the termination procedures.
2. In the process of construction, if either party proposes to terminate the contract, it shall submit it to the other party in written form. After both parties agree to go through liquidation procedures and conclude an agreement to terminate the contract, the contract shall be deemed to be terminated.
Article 7: Entry into force of the contract
1. This contract shall be sealed by both parties and come into force after being signed.
2. This contract is made in duplicate, one for each party and the witness department.
Party A (Owner): (Signature) Party B: (Signature)
Tel: Tel:
Date of signing:
Text of electronic contract for interior decoration (5 articles) Related articles:
★ 5 electronic contract templates for decoration design.
★ Beijing House renovation contract Electronic Edition (5 articles)
★ 202 1 5 electronic versions entrusted to renovation contract.
★ Indoor renovation contract Universal Template
★ The latest simple indoor renovation contract 5 articles.
★ Five copies of renovation contract Agreement on Model House.
★ 5 model decoration service contract
★ Unit Room renovation contract five articles.
★ 5 Formal contract template for decoration.
★ Five written renovation contract format references.