The 30-million-ton coal berth built by the company is a supporting project to solve the shortage of national energy transportation, the pressure of transporting coal from north to south and the capacity expansion and diversion of Daqin Railway. At the same time, it is beneficial to control the current loading and unloading environment of non-specialized coal in Jingtang port area and prevent and reduce coal dust pollution. The completion and commissioning of this project is the need of the long-term development of coal transportation in China; It is the need for the long-term development and expansion of large-scale transportation corridors in Jingtang Port Area.
The total investment of the project is about 3 billion yuan, and it is planned to be completed by the end of August 2007. The main project includes three coal loading berths with 654.38+10,000 tons, 50,000 tons and 35,000 tons respectively. Equipped with two three-steering "O" dump trucks; Three shiploaders, four stacker reclaimers, four coal screeners and two coal blending reclaimers; The yard covers an area of 540,000 square meters, and the coal storage capacity of the yard is 23 1 10,000 tons; It accounts for 710.5 million square meters of water area (excluding waterway) and 32,985 square meters of ancillary buildings.