Construction organization design scheme of central heating project?

What is the specific content of the construction organization design scheme of central heating project? Zhong Da Consulting will answer your questions below.

1. Project overview

1. 1 Overview

Xx community pure grain area is located in a county of Shandong Province. After more than 20 years of construction, the region has formed a comprehensive industrial community with oil industry as the main body and integrating commerce, trade and residence. Guangqing Road is a county-level traffic artery from Guangrao to Qingcheng. Guangqing Road divides pure beams into three communities: pure brocade, pure embroidery and pure prosperity.

The pure beam central heating project in Xx community is located in the southwest of the pure beam area, which mainly provides heat sources for the pure beam area. The planned total heating area is 78× 104m2, the designed supply and return water temperature is 130/70℃, the heating load index is 65W/㎡, the designed total heating capacity is 58MW, and the maximum heating radius of the primary network is about 2km. The main body of this project. Open-pit mine, covering an area of 3036㎡, with induced draft fan room, covering an area of 150㎡, with 1 brick chimney, 60m in height and 2.5m in upper mouth diameter; And other supporting projects.

The design temperature and pressure of the water supply pipeline of the first-class pipe network are 130℃ and 1.5MPa, respectively, and the medium is hot water, which belongs to the GB2 pressure pipeline.

The approval documents of this project are the document [2006] 1 issued by Shengli Petroleum Administration Bureau in March 2006, and the reply on the feasibility study report of ××××× community pure beam central heating project issued by Shengli Petroleum Administration Bureau of China Petrochemical Group, with a total investment of 5 1 10,000 yuan.

This project is designed by Shengli Oilfield Shengli Engineering Design Consulting Co., Ltd., supervised by Shengli Construction Supervision Co., Ltd. and supervised by Shengli Oilfield Construction Engineering Quality Supervision Station.

1.2 engineering features

1.2. 1 This project has a heavy workload and a tight construction period, so it is necessary to arrange the progress reasonably. All professional construction teams should have overall awareness, take the overall situation into account and strictly implement the progress plan.

1.2.2 The construction of the main boiler room is a key project that restricts whether the whole project can be put into production on schedule. In the whole construction process, boiler room construction is the main line, interspersed with other civil engineering, installation engineering and electric control engineering.

1.2.3 construction runs through the whole rainy season, which brings inconvenience to construction, especially civil construction.

1.2.4 This project has both boiler installation and pressure pipeline installation. According to the requirements of "Regulations on Safety Supervision of Special Equipment" and other relevant regulations, it is necessary to establish a quality management system for boiler installation and renovation and a quality management system for pressure pipeline installation in engineering construction, and designate their respective responsible personnel to be responsible for boiler installation and pressure pipeline installation respectively.

1.2.5 new technologies will be adopted and popularized as far as possible in the construction of this project. The construction difficulties are mainly boiler installation and chimney construction. The terrain of the first-class pipe network is complex, and it is difficult for materials to enter and leave the factory, which will increase the difficulty of engineering construction.