Which projects did Xiong 'an, 14th Water Conservancy Bureau of China, win the bid?

Xinmaichong Tunnel Emergency Repair Project (Xinmaichong Tunnel Emergency Repair Project) and Liaoning Liaohe Flood Control Promotion Project won the bid.

China 14th Water Conservancy and Hydropower Engineering Bureau Co., Ltd. (hereinafter referred to as China 14th Water Conservancy and Hydropower Engineering Bureau) has the special qualification of general contracting of water conservancy and hydropower projects, the first-class qualification of general contracting of municipal public works and highway projects, the first-class qualification of earthwork and tunnel engineering, the first-class qualification of subway engineering construction, the first-class qualification of engineering design and water conservancy industry and the qualification of contracting foreign projects. And through the quality management, occupational health and safety management, environmental management certification, known as the "underground iron army", "hydropower station."

Business scope: water conservancy and hydropower engineering construction, railway engineering construction, municipal public works construction, building engineering construction, highway engineering construction, electromechanical installation engineering construction, power engineering construction and related engineering technology research, survey and design; Foundation engineering construction; Professional construction of tunnel engineering; Fabrication and installation of steel structure engineering, etc.