Company activity planning

Corporate Activity Planning 1 I. Activity Objectives

This activity is the first group entertainment organized by our new employees since they joined the company. I hope that through this gathering, we can enhance the understanding between new employees in various departments and enhance our team spirit. While entertaining, you can also cultivate your own organizational ability, performance ability and other aspects to stimulate your creativity. This activity is based on singing, interspersed with some competitive games, and gives some material rewards to the winners of the games.

Second, the specific practices

August

XXX is the activity advocate, predicting the effect of the activity, formulating the draft activity plan, and sending it to the general manager's office for approval;

Count the list of people who are willing to participate in this activity.

September 15

After being approved by the general manager's office, make preparations for the event.

(1) Buy game props and prizes;

(2) Buy the food to be eaten in the activity;

(3) Book Miss A's big private room by phone in advance;

(4) Contact the general affairs of the company to arrange dinner and car use for the activists.

September 16

17: 00 Call activists to eat in the restaurant;

/kloc-leave the company on time at 0/7: 30, and start activities after arriving at the destination.

At the end of the activity at 22: 00, arrange to send the personnel back.

Third, the content of the game.

1, fools move mountains

Game props: table tennis (20), thick straws (4) and pots (2, which can be folded with a4 paper).

Rules of the game: Take a breath with a straw, and move 10 ping-pong balls from basin A to basin B, with the distance between basin A and basin B being 4m.

Don't touch the ball with your hands during the action, otherwise the foul won't count and you will be fined again. The first player to move 10 balls wins (better).

Number of participants: 2 people, arranged in two groups.

2. The word "love" contest

Rules of the game: Divide the participants into two groups for a song contest, each of them sings a song, which must contain the word "love", and the last party wins (just melon seeds).

3. A pair of devil shoes

Game props: rubber shoes (1 pair), a long and slippery living animal (secret),

Rules of the game:

Two performers: produced by "natural appearance", two people each wear a rubber shoe, one of them wears a shoe with a small animal in it. After putting on their shoes, they walk around the venue twice, can't talk, and act as if nothing has happened.

Others: When the above two people walk, pay attention to what they say and make a choice: "Who has something in their shoes?" , choose the appropriate reward (lollipop). If more than half of the people are rewarded, the performer will be fined to sing a song.

Step 4 clip balloons

Game props: balloons (4)

Rules of the game: Divide the participants into two groups to form two teams. Everyone will put their hands behind their backs. Starting from the first person, he will hold the balloon with his head and body and pass it to the next person. The first group will win (chewing gum)

Four. Activity budget

1. Location: Miss A ktv Dabao (independent bathroom)

54 yuan/hour before 20: 00.

After 20: 00 144 yuan/hour is expected to be within 400 yuan.

2. Activity props and prizes: the prizes are controlled within 3 yuan/month.

The straws needed for the activity can be taken in the supermarket, and there is no need to buy them.

3. Active food:

Drinks, melon seeds, fruits, etc. Estimated cost 100 yuan.

Total budget of activities: 560 yuan.

Company event planning 2 I. Event background:

With the gradual expansion of the company team, there will inevitably be obstacles and conflicts in cooperation and service communication between new and old employees, between business teams and between business and logistics functional departments. In order to make the working atmosphere more harmonious, promote better communication between departments, improve work efficiency and create greater profits, the planning department has specially customized a series of periodic activities to ease employee relations and promote the efficiency of departmental cooperation.

Second, the purpose of the activity:

Activities are conducive to instilling new ideas into the company, and interaction can increase the affinity between people in various departments. Through periodic activities, timely and effectively convey the latest spirit and instructions of the company, so that employees can understand the new trends of the company more clearly. Choosing different departments for networking activities can enhance cooperation, understanding and tolerance among employees with different positions and responsibilities, thus achieving unity, effective communication and efficient team.

Third, the time of the incident:

Take two months as a cycle.

Fourth, the main body of the activity:

All employees of the company (organize personnel activities according to the situation between different departments and employees. No more than 60 people for large-scale activities and no less than 30 people for small-scale activities)

Verb (abbreviation for verb) Activity place:

The main venue is the training room, and the outdoor can be a farmhouse, a holiday villa and a free main park in the urban area.

Activity of intransitive verbs:

Periodic activities can be roughly divided into three categories: expansion projects, symposium projects, sports activities, and knowledge interest competitions.

According to different activity themes, the planning department will take the lead in organizing management communication between the training department and departments, and determine the final activity plan to ensure that the activity can solve substantive problems and maximize the value of the activity.

(1) expansion is divided into indoor expansion and outdoor expansion.

Indoor expansion: in a short time, the adjustment of mentality and thinking has good effect, quick effect, low cost and rich activities.

Outdoor development: it can form touch and stimulation, strengthen service consciousness, have good durability, enhance the cooperation ability among teams, and achieve the purpose of mutual cooperation and trust among teams.

(2) Tea party: flexible in form and rich in content. It can be divided into a series of short segments, such as team talent show, small game, personal talent show, symposium, short-term experience of job role change, case sharing, exchange of ideas and experiences, telling the truth, and spreading love. It can not only promote the company as a group, but also accumulate resources for its business.

(3) Activities: table tennis competition, tug-of-war competition, Persian flying carpet, rope skipping competition, hoop rolling competition, relay competition, chorus competition, karaoke competition, team competition and friendly competition in scenic spots. You can also organize send warm activities in nursing homes, left-behind children, problem children and other areas to provide services and condolence activities for the widowed elderly and empty nesters in the community, which can not only improve the organization and coordination ability among employees, but also help to enhance the company's image and publicity.

(4) Real estate professional knowledge contest, assistant team service etiquette contest, house worship, competition for customers, how to treat customers, finding houses, ways and means debate contest for customers, skill contest for showing brokers, etc. Competition can not only promote the exchange of experience between employees, but also improve the enthusiasm of employees.

Seven. Activity budget

The minimum standard for each activity is 5 yuan per person, and the maximum standard is per person 10 yuan.

Company event planning 3 I. Description of the theme of the event

Theme of the event: Double Ninth Festival, deep respect for the elderly-Double Ninth Festival theme association.

Alternative theme: Double Ninth Festival, one-day tour of xx.

Filial piety is the first of all virtues, and you can enjoy health in September and September.

Activity purpose:

1. As a traditional festival in China, the Double Ninth Festival is also a festival for the elderly, which is our best opportunity to maintain and develop customers with emotional ties. With the help of holiday opportunities, grasp the reasonable theme, contact feelings and promote sales.

2. By portraying happy life segments at the fraternity, participants can be attached to a better life, thus arousing their enough attention to health.

3. Create corporate image, enhance corporate image and promote customer upgrade.

Second, the activity time

Before 65438+ 10 xx

Third, the invitee

Mainly invite customers whose children are not around. Customers' gratitude and appreciation for the friendship that they never forget to reunite with our employees during the festival will become an important factor affecting their on-site purchase.

Four. Key links, selling points and highlights of the event

1. According to the custom of hiking on the Double Ninth Festival, all localities can carry out tourism marketing according to their actual conditions. It is suggested to arrange lectures on health knowledge in large classes in the morning, give lectures and sell goods. Free lunch at noon and visit tourist attractions in the afternoon.

Since ancient times, Chongyang has had the custom of hiking, climbing mountains, enjoying chrysanthemums, drinking chrysanthemum wine and inserting dogwood.

2. Every customer who attended the meeting presented a nice little gift.

3. Customers and employees drink chrysanthemum tea or chrysanthemum wine.

4. Eat Chongyang cake or cake.

5. The on-site promotion policy is very generous. (The package for respecting the elderly is determined by each company)

6. All customers can participate in the live lottery.

7. Poetry game. (test)

Verb (abbreviation of verb) related props and venue layout

On the basis of the original flag, the Mid-Autumn Festival flag was hoisted at the venue: Enjoy health on the Double Ninth Festival, the world is full of filial piety, maternal love is like water, and a treasure is a healthy parent in the world.

Activity flow of intransitive verbs

Before the opening: Play the "Opening Short Film" in a loop.

8: 30-8: 50: The host takes the stage to introduce the theme of the event and the legend and origin of the Double Ninth Festival.

8: 50-8: 55: * * Drink chrysanthemum wine or chrysanthemum tea.

8: 55-9: 00: Employee Performance

9: 00-9: 20: Poetry Game

9: 20-9: 35 "nucleic acid feature film" is shown.

9: 35-9: 45: Media certification for short film screening.

9: 45-9: 50: Aerobic exercise (let old friends exercise muscles)

9: 50- 10: 00: Show a short interview with old customers.

10: 00 ——10:15: Eat Chongyang cake or cake.

10:15—10: 20: The host announced the promotion policy.

10: 20 ——11:30 Test, promotion, lottery and award.

Seven, lottery awards.

Each region designs its own lottery prizes according to the actual situation in the region and the needs of customers. It can be a company product or a daily practical product. The main purpose is to attract customers' purchase rate and promote the company's new products.

Eight. Matters needing attention in activities

1, uniform tooling for employees.

2. During the meeting, employees in freelance positions sit alternately, and the rest of the employees stand neatly on both sides of the meeting, clapping actively and creating field effects.

The store manager and the regional manager are in charge of this matter.

4. During the meeting, employees are not allowed to go in and out of the venue or walk around the venue at will.

5. During the meeting, it is not allowed to answer, make phone calls, receive or send short messages in the meeting room.

6. The person in charge of the venue is responsible for supervising and recording the venue discipline.

Company event planning 4 I. Purpose of the event

1, strengthen team cohesion and teamwork ability;

2. Stimulate the enthusiasm of employees to participate in various activities of the company;

3. Strengthen and consolidate employees' familiarity with the company's management system, corporate philosophy and product knowledge;

4, leisure and entertainment, to alleviate work fatigue.

Second, the active object.

All employees per hour

Third, the activity time

Mid-August of 20xx, or mid-September of 20xx.

Fourth, the venue

Chimelong water park

Verb (abbreviation for verb) tourist route

Depart from the company at 8 am and arrive at Guangzhou Changlong Water Park at 9 am.

Drifting River (10-1 1)

Enter from the team entrance at the east gate, which is closer to the center stage. The drifting river is a long and narrow drifting landscape belt, which is divided into six landscape areas along the way. Tropical customs, ice age and Penguin Island are just one of them. However, these penguins in black and white dresses are really cute. They are lying on the floating ring and counting penguins. Suddenly, they were hit by a friend's floating ring that caught up from behind. So the two teams went around and continued their drifting journey.

Super speaker (1 1 point 10 point-12 point)

Loudspeaker is a large-scale project in water park, so you must play it. Eight people occupied two floating circles. After listening to the commentator's explanation, they couldn't wait to climb the floating circle, and they didn't forget to ask the staff to take a group photo for them. They will take the camera away when they come back. The rotating force of the huge horn made the girls scream. Personally, I think it is similar to the impact of a roller coaster, but the water column that came at me was still somewhat unexpected. An experienced friend said that it would be faster and more exciting to play the behemoth bowl after playing the big horn.

12 o'clock-12: 30 lunch and free activities.

Beast Bowl (12: 30-13: 30)

The behemoth bowl is an upgraded version of the big horn, and its shape design is not as dazzling as the big horn. However, due to the semi-sealed giant bowl and the longer slideway, the bowl can rotate at a higher speed in the floating ring, and people really feel thrown out when sitting in the floating ring.

Jet chute (13: 40-14: 40)

Jet slide is the highest project in the whole water park, with good vision and good vision. However, standing on the high platform is really a little scary. After listening carefully to the lecturer's demonstration, I climbed up the floating circle and prepared to challenge this "water roller coaster". Due to the height and strong current, the whole floating ring slides very fast. In addition, the slope formed by the track sometimes makes you feel weightless. In addition, there is no safety belt protection, so there is the impact of water flow, which increases the thrilling coefficient of play.

Racing competition (14: 50-15: 50)

Car racing is a project that can be challenged with friends. Different from other events, this event is to pounce down the slide with a skateboard similar to surfing. It is more participatory and skillful than sitting in a floating ring, faster than anyone and farther than anyone else. The secret of gliding is to clamp your hands and feet and reduce the resistance of water flow. But in this project, because of the principle of acceleration of gravity, those friends who are not fat in weight and figure are also easy to dominate. For reference only.

vertical limit

It is also a project that challenges speed and height, also known as super slide. There are three tracks, among which the blue track is fully enclosed, with many corners and strong centrifugal force.

Big skateboard (16-17)

After experiencing the difficult sprint competition and vertical limit, coming to the big skateboard is a relaxing and stretching project. It is also a project suitable for two people to play. The huge platform of the big skateboard provides an excellent view.

Free activities for half an hour, 17: 30 back to the company.

Cost budget of intransitive verbs

August

Adult tickets 198 yuan/person *83 people 16434 yuan.

University student ticket 160 yuan/person *2 320 yuan.

Edible self-provided

Articles storage cabinet 40 yuan/a * 10 400 yuan

Car and fuel costs 100 yuan * 2 times that of 200 yuan.

* * * 17354 yuan

10% discount on group purchase 156 18, 6 yuan.

September

Adult tickets 140 yuan/person *83 people 1 1620 yuan.

College student ticket 1 10 yuan/person *2 220 yuan.

Edible self-provided

Articles storage cabinet 40 yuan/a * 10 400 yuan

Car and fuel costs 100 yuan * 2 times that of 200 yuan.

* * * 12440 yuan

Group purchase 10% discount11/96 yuan.

Company Activity Planning Chapter V Activity Background

Jiayu Logistics has a history of nearly ten years, and it is a comprehensive logistics company with professional informationization. Now the total assets exceed 1 100 million yuan, and there are more than 150 branches in China. With excellent talent team, advanced information system, advanced service concept and nationwide operation network, Jiayu has increasingly become a well-known brand in the logistics industry. Excellent enterprises often provide employees with a broad stage to show themselves. In order to realize the interaction among Jiayu employees, enhance their sense of belonging and identity to Jiayu, and consolidate and publicize Jiayu's strong corporate culture atmosphere, on the eve of Jiayu's upcoming 10 anniversary, and on the occasion of the arrival of the Mid-Autumn Festival, the second traditional festival in China, a Mid-Autumn Festival party with family characteristics was held to let Jiayu people shape themselves and corporate image. In the future,

activity theme

Go your own way (to be determined)

Family and beautiful people-with you tomorrow.

Activity purpose

1. Let employees fully show themselves, know themselves and understand the atmosphere of the corporate family during the activities.

2. Realize the interaction between leaders and employees, so that workers at all levels of the enterprise can communicate under the same platform.

3. Make effective use of the activity process and its publicity strategy, so that everyone can feel the development and progress of Jiayu. At the same time, Jiayu is packaged to promote the formation of its external image and internal culture.

4. Let Jiayu people know themselves and discover themselves through Jiayu Life Show, paving the way for the promotion of bi behavior identity in the future.

target audience

Jiayu headquarters and Shanghai Jiayu employees

I-word duration

XX year, month, day and night

site of activity

Shanghai Jiayu head office canteen

Activity content

I. Solicitation scheme:

1, all departments in the headquarters, each department carries out at least one program; The Shanghai company has no less than three projects.

2. Complete the scheme declaration before 1 1 this Thursday.

Rehearsal will be held this Friday.

4. Program applicants should bring their own accompaniment instruments or audio CDs.

2.XX Mid-Autumn Festival party site

Relay time allocation

1, folk music Mid-Autumn Festival promo

Another short promo kicked off the party.

2. Leadership speech

The host introduced the guests' invitation, and Mr. Wang gave a speech to Jiayu employees and invited everyone to raise their glasses together.

3. Activities selected and reported by each department (specific arrangement to be determined)

4. Jiayu Life Show

Description: The purpose of this activity is to let Jiayu people know themselves and the importance of paying attention to etiquette in the performance. Today, employees represent a department, and the future represents the image of Jiayu as a whole, so that the audience can also benefit from it. This activity has strong participation and appreciation.

Each department selects two employees as the image representatives of the department, and prepares 3-4 sets of living clothes, a set of summer clothes, a set of casual clothes, a set of work clothes and a set of clothes designed and matched by the department. Come and take part in this Jiayu people's life show. After the performance, we will invite the audience to comment on it.

5. Competition

Same song.

Invite leaders and employees to work together on a song, and invite three leaders and three employees.

Let me guess, let me guess, let me guess.

Invite the staff under the stage to guess an item with five questions, and the right one can take away the prize.

The prize setting can be (CD, small household appliances, daily necessities, small animals or people, mainly to enhance the entertainment effect).

You are my eyes.

The race was completed by two people, one blindfolded, the other guided him to finish the journey at the finish line, and set some obstacles on the runway, and the team with the shortest time won.

6. Lottery and gift distribution

Effect prediction

As this activity is organized by Jiayu in traditional festivals, it is creative and interactive. As long as it is properly implemented, it will attract the active participation of internal employees and the attention of external enterprises. It is estimated that the actual number of participants will reach more than 600, and there will be five online reports. Jiayu employee coverage is expected to reach 1/2 or more. At the same time, this activity will help to promote the formation of a new corporate culture, enhance the confidence of employees, show a cordial, United and efficient image to the outside world, and effectively enhance the visibility and reputation of enterprises.

Media communication strategy

1. As the September issue of Jiayu Tiandi has been delivered for printing, Jiayu Tiandi will release a notice in the news center of Jiayu Tiandi's homepage by using online media.

2. Follow-up report after the event, and make effective use of the advantages of Jiayu Tiandi and Jiayu homepage.

3. After the activity is implemented, make news dissemination and submission on the relevant logistics industry websites.

4. After the activity, post pictures and related reports in the canteen. Can take the form of billboards, posters, the scene will be carved into a CD, as publicity materials for corporate image in the future. You can also upload web pages.

Advertising media communication strategy

1. The scheduled execution part shall be sent to all departments in advance (document notice).

2. Poster publicity before the event (it can be used as a preliminary guide for the popularization of poster culture).

3. Say "What do you want to see in the Mid-Autumn Festival, unexpected surprises are waiting for you" in one sentence, and set up news points for reference before the program and film screening are determined, so as to rationalize the internal expansion of corporate culture.

Measures to realize the programme of activities

1. Contact the Shanghai Division of Labor and invite them to be the organizers of this event, and invite the headquarters to be the co-organizers.

2. After negotiation and consent by the organizer, report the activity plan to relevant departments for approval.

3. Establish a unified implementation planning team, classify the work and implement it to those responsible.

Activity site layout

1. In the design and layout, we must pay attention to the unity of overall style and the difference of local decoration, that is, keep the logo, background board and main color consistent, make full use of the original conditions on the site and bring forth the new.

2. The central background consists of a pearl balloon and a thin neon wall, on which the activity theme and the image logo of Jiayu are pasted.

3. On both sides of the central background of the stage, there are screens with white advertising background boards to isolate the layering of the stage, which are mainly used for the projection background wall to work with computer projection equipment.

4. The stage is similar to a T-shape. Fine neon lights are directly connected to the ground to form the image of the stage, with flowers and proper decoration, and the audience is on both sides of the stage. This design facilitates the interactive relationship between the stage and the stage, and also cooperates with the performance of the program.

5. Main renderings

Restaurant party layout

Working procedures and division of labor

working procedure

1. Preparatory work

XX year, month, day, solstice, month, day.

1), declaration of activity plan

2) Design and delivery of invitation letters for activities

3) Design of venue layout.

4) Collection and declaration of activity plan

5) Compilation of relevant news materials and news reports

6) Material procurement

2. Activity site work

XX year, month and day

1). The whole process of reception activities.

2) Monitor the whole process of activities and coordinate specific matters.

3). On-site camera photography and on-site system

4). The implementer of the on-site scheme.

5) Distribute materials, gifts and rewards

6). Site cleaning and storage

Deal with the aftermath

Time XX years, months, days, solstice days, months, days.

1), organize all the words and pictures of the activity.

2) Collection and arrangement of event news reports

3), work summary and effect evaluation

In the above work, the work has been implemented by the contractor and its owners and units have been implemented.

Activity funds and budget

1) site layout cost * yuan

2) Catering and entertainment expenses * yuan

3) The purchase cost of various activities is * yuan.

4) Labor cost * yuan

5) Gift fee * yuan

6) Bonus fee * yuan

7) Current cost * yuan

8) Advertising fee * yuan

9) Performance fee * yuan

Activity evaluation criteria

1) The actual number of participants * shall not be less than 500.

2) There shall be no less than 2 reports on media-related activities.

3) Information coverage rate of all employees' activities at headquarters * 1/2.

4) There are no obvious mistakes in the execution of the event site.

5) The use of activity funds is strictly controlled within the budget.

6) The company's popularity increased by *5%

7) The reputation of the company will be improved by *5%.

Description of related matters

1. The planning book is the overall planning of the planned XX Jiayu Mid-Autumn Festival. Some contents are inevitably rough, which need to be further refined after the overall idea of the activity is determined, and specific implementation plans should be formulated accordingly.

It usually takes one month to prepare for an activity like this. However, there is only one week before the event, so it should be tense. It is expected that the organizers will review and determine the overall plan of the event as soon as possible and put into the preliminary work as soon as possible.

3. This planning team has not been established for a long time, but with a professional, innovative and serious attitude, it has considerable design planning ability, and strives to standardize its operation and achieve high-quality results. If entrusted, do your best to live up to your high expectations.