Shanghai Xiang Yong Decoration Jinan Tao Hong Decoration Construction Process

1. Decoration construction can be roughly divided into the following stages: 1, civil construction stage.

: enter the site, tear down the wall and build the wall; Trenching, hydropower transformation and acceptance; Buried trunking concealed hydropower renovation project, waterproof project, 24-hour closed water test of toilet and kitchen floor; Toilet and kitchen wall tiles.

2, basic processing stage:

When the carpenter comes into play, hang the ceiling and plaster the corner line; Door cover, window cover, wooden cabinet frame; Synchronize all kinds of wooden doors, modeling doors and flat pressing doors; Brush the wooden panel with dust-proof paint (clear oil); Leveling and laying marble countertops on the windowsill; Sticking, marking and hardcover of veneer; Treatment, grinding and leveling of grassroots walls; Glue the joints of furniture and doors and windows (protective edges).

3. Detail processing stage: brush the wall at least three times; Furniture paint comes into play, fills holes and paints; Treat the corner, lay floor tiles, solid wood or composite wood floors, waterproof marble strips and skirting lines; Installation and debugging of lamps, switches, sockets, sanitary ware, handles and door locks; Cleaning, floor tile joint repair, exit; Internal preliminary acceptance of decoration company; Three parties make an appointment for formal acceptance and deliver it to the owner.