Tianjin Baoding Railway
According to the design, Jinbao does not belong to the high-speed rail, and its running speed can't meet the requirements of the high-speed rail (above 250), but it belongs to the passenger dedicated line, that is, it only takes the bus. It starts from Tianjin West Railway Station Jinbao Freight Yard and ends at Baoding existing station, connecting Beijing-Guangzhou, Beijing-Shanghai and Beijing-Kowloon trunk lines. After the opening, there should be a through train from Shijiazhuang to Tianjin West Railway Station, and there is no need to transfer from Baoding.