In our daily life, people use responsibility letters more and more, and signing responsibility letters can effectively enhance our sense of responsibility. Presumably, many people are worried about how to formulate the responsibility book. The following is my carefully arranged responsibility book for equipment installation safety (5 general articles), which is for reference only and I hope it will help you.
Responsibility Letter for Equipment Installation Safety 1 In order to conscientiously implement the Law on Work Safety and the Measures for Supervision and Management of Work Safety in Highway and Waterway Projects, adhere to the principle of "safety first, prevention first and comprehensive management", strengthen the management of work safety, attach importance to publicity and education, consolidate basic management, pay attention to the management of hidden dangers of accidents, implement the responsibility system for work safety, and ensure the safety of construction and production process and prevent accidents. Do a good job in environmental protection and prevent environmental pollution. According to the provisions of the state and relevant departments, combined with the construction and production situation, formulate the responsibility book for production safety and the commitment book for environmental protection. Details are as follows:
A, the project safety production target:
(1) Overall goal of safe production:
Put an end to safety accidents, avoid casualties, and strive for provincial-level "safe construction site" construction demonstration sites.
(2) Safety management control objectives:
1, and the death accident of employees at work is zero.
2, fire, explosion, poisoning, drowning, equipment, pipeline damage and other social impact accidents are zero.
3. No-responsibility accident.
4. No major complaints from society, owners, employees and interested parties.
5. The accident frequency of employees injured due to working years should be controlled below 2.0‰.
6. The rate of safety education and training, the certificate-holding rate of safety management personnel and special operations personnel, the qualified rate of special equipment testing and the rectification rate of hidden accidents reached 100%.
7, the construction site safety technology and safety management to jgj59-20 1 1 "building construction.
Safety inspection standards "qualified above standards.
8. According to the Construction Standard for Safety Construction Site of Highway and Waterway Engineering in Jiangsu Province (document number [20 15] 14), and reach the standard of 85 points or above.
9. The safety investment shall not be less than 65438+ 0.0% of the total contract price.
Second, the department's responsibility for production safety
(1) All machines, tools and accessories used for construction and production should have factory certificates at the time of purchase, meet safety requirements at the time of distribution, and must be overhauled after recycling.
(two) the procurement of dangerous goods and articles containing drugs shall be handled in strict accordance with the relevant provisions of the state; The stacking and stacking of asphalt, bagged cement and other materials must meet the safety requirements, and no personal injury accidents may occur during receiving.
(3) The finished materials purchased for support shall be qualified according to regulations and meet the requirements of use intensity to ensure that no safety accidents occur during use.
(4) Materials used for approved safety facilities should be included in the plan and supplied in time.
(5) Formulate safety measures to ensure the safe operation of machinery, electric power, lifting equipment and other pressure vessels. Always check all existing safety protection devices and accessories to ensure that they are complete, sensitive, reliable, effective and safe, and urge operators to carry out daily maintenance to keep them in normal and good technical condition.
(6) For the mechanical equipment that seriously endangers the safety of employees, technical improvement measures shall be put forward and implemented jointly with the technical department.
(7) The safety protection devices of newly purchased machinery, other pressure vessels, electrical appliances and other equipment must be complete and effective. The factory certificate and technical data must be complete, and safety operation procedures should be formulated before use. Large-scale machinery and equipment must have the inspection certificate of the national-home-safety-safety-technical supervision department, and can only be put into use after being reported to the supervision department for re-inspection.
(8) When renting a vehicle or machinery and equipment, the operator of the lessor's vehicle or machinery and equipment must have a special operation certificate and sign a safety production responsibility letter with the lessor.
(9) Seriously implement the safety regulations and safe operation system of pressure vessels such as mechanical, electrical and hoisting settings. Violators should be dealt with seriously, and accidents of mechanical and electrical equipment should be seriously investigated and analyzed.
(10) Regularly educate employees on safety awareness and discipline, and organize employees to learn and master the performance, storage and safekeeping safety requirements and regulations of materials, especially dangerous goods.
Third, the assessment and rewards and punishments:
It shall be implemented in accordance with the "Safety Production Management System" of the newly-built project connecting line S258—LJX in the south section of Jiangsu Highway.
Party A (Project Department of Contract S258—LJX): Party B (person in charge): signature and seal: signature:
Equipment installation safety responsibility book 2 is to conscientiously implement the safety production policy of "safety first, prevention first and comprehensive management", prevent and reduce the occurrence of production safety accidents, and ensure the safety of employees' lives and company property. According to the 20 15 annual target responsibility letter of the company's safety production management, in order to successfully complete the target and realize the company's sustained, healthy and rapid development, the annual comprehensive target responsibility letter of safety production and environmental protection is specially signed.
I. Responsible subjects and executors:
1. The employees of the Equipment Department are the responsible subjects of this responsibility book.
2. The Equipment Department will assess and deal with the safety and environmental protection work of all employees and the safety and environmental protection responsibility of the main person in charge according to this responsibility letter. All employees have the obligation to complete the responsibility objectives of this responsibility book, and accept the supervision and management of the equipment department and the assessment of the safety and environmental protection production responsibility objectives.
Second, the assessment indicators
1, safety production responsibility
(1), many casualties are zero.
2. Major fire and explosion accidents are zero.
(3) Major equipment and production accidents are zero.
(4), the general accident is zero.
5], minor injuries to zero, minor injuries to zero, a total of no more than 0.
[6], the injury rate per thousand people is 0.
Once, safety devices, safety facilities intact rate 100%.
At present, the incidence of occupational diseases is 0.
Levies, dust poison point detection qualified rate of 95% or higher.
⑽. Completion rate of safety measures plan ≥ 100%.
2. Environmental responsibility
(1), major environmental pollution accidents are zero.
(2) The pollutant discharge is zero.
(3) Keep records of the discharge of "three wastes" and the operation of pollution prevention facilities.
(4), maintain the construction site, do the work, material net, site clear.
5], solid waste implementation of the waste recycling management regulations.
[6], production process wastewater shall not be discharged into the ground, can not have channeling phenomenon.
Once, technical transformation and maintenance plan contains environmental protection content. If there is sewage, you need to fill in the sewage declaration form and take pollution prevention measures.
Being, "three wastes" emissions should be declared in a timely manner, environmental protection facilities should be declared in a timely manner.
Levies, timely investigation and handling of pollution hazards.
Appendix: Interpretation of Safety Indicators
1, machinery and equipment, production accidents: general accidents: losses caused by liability accidents are more than 30,000 yuan -65438+ 10,000 yuan (including 65438+ 10,000 yuan); Major: the loss caused by the accident is more than 654.38+10,000 yuan and less than 300,000 yuan (including 300,000 yuan); Extra large: the accident caused losses of more than 300,000 yuan.
2. Serious injuries, minor injuries and minor injuries at work: determined according to the lost working days specified in the Classification Standard for Casualty Accidents of Enterprise Employees (GB 644 1-86).
III. Contents and objectives of safety and environmental protection management responsibilities:
1, conscientiously implement the national guidelines, policies and regulations on safety in production, and combine with the actual situation,
Establish and improve the equipment safety management system, operating rules, implement production equipment management, so as to have rules to follow and implement supervision and management.
2. Be responsible for the safety management of the equipment and devices under its jurisdiction, and be responsible for their safety status.
3. Be responsible for the implementation of major and medium-sized repair projects of equipment and facilities under its jurisdiction, and at the same time formulate safety measures and safety construction plans to ensure the safety and quality of major and medium-sized repair projects.
4. When performing maintenance tasks, implement safety measures at the same time.
5. Complete the safety technical measures plan and hidden dangers rectification measures on time.
6. Actively cooperate with the investigation, analysis, statistics and reporting of equipment accidents under its jurisdiction.
7. Actively participate in equipment safety education activities and learn safety knowledge.
8, for all kinds of inductrial injury accident, must carry out the principle of "four pass" to investigate and deal with. (that is, the cause of the accident has not been ascertained, the person responsible for the accident has not been dealt with seriously, and I and my employees have not been educated and have not taken measures).
9, protective equipment wear is complete, the production site is not illegal operation, illegal operation, have the right to refuse all kinds of illegal command.
10, when there is a contradiction between daily work and safety management, safety work should be given priority.
1 1. Adhere to safety study on Friday, learn safety regulations, national laws and regulations, and various safety management systems, summarize the safety work in the previous stage, and arrange future safety work.
12. Manage the safety devices, protective equipment and fire-fighting equipment under its jurisdiction to ensure that the intact rate reaches 100%.
13, the production site shall not occupy the safe passage (door), to ensure smooth%.
Four, assessment and rewards and punishments:
1. According to the Management Measures for Safety and Environmental Protection Performance Appraisal, the company conducts a monthly appraisal of the completion of various indicators of the safety and environmental protection target responsibility book, which will be included in the company's performance appraisal in that month. At the same time, all the contents required in this responsibility book will be included in the annual assessment of the department.
2. If the company fails to take effective measures to cause casualties due to neglect of safety production, illegal operation, illegal command, dereliction of duty or discovery of hidden dangers and hazards, the company will punish the personnel who have the above behaviors according to their main responsibilities, important responsibilities, general responsibilities or leadership responsibilities. If a crime is constituted, criminal responsibility shall be investigated by judicial organs according to law.
Verb (abbreviation of verb) implementation period and change
1. This responsibility letter is made in duplicate, with each party holding one copy. The validity period is from 20xx 1 to 20xx 1 and 3 1 in February.
2. This responsibility letter shall come into effect after being signed by the representatives of both parties. Matters not covered in this book shall be revised after study by the company safety committee. Any modification, supplement or change shall be made in written form and shall be regarded as an integral part of this responsibility letter.
Shanxi jufeng energy co., ltd
Equipment department
Representative: Person in charge:
20xx65438+1October 26th
Equipment Installation Safety Responsibility Letter 3 In order to do a good job in the company's safety production in 20 15 years, strengthen the company's internal safety management, implement the safety production responsibility system, and ensure the life and property safety of our company and all employees, the company signed the following safety target responsibility letter with the equipment management department.
I. Work objectives
1, death and serious injury accident (including traffic responsibility) is zero.
2, major fire (explosion) accident is zero.
3. The accident rate of electric shock is zero.
4. Major environmental pollution accidents are zero.
5. The occupational morbidity of employees is zero.
6. The correct wearing rate of labor protection articles is 100%.
7. The qualified rate of safety training and education is 100%.
8. The implementation rate of operating procedures is 100%.
9. The implementation rate of safety hazard rectification 100%.
10, the setting rate and standardization rate of safety facilities, safety signs and safety warnings reached 100%.
Second, the responsibility content
1, responsible for production safety within its jurisdiction, and establishing and improving safety rules and regulations and operating procedures.
2. Actively participate in all kinds of safety inspections and trainings organized by the company, and constantly improve safety skills.
3. Be fully responsible for the management of all kinds of production equipment, electric power and pipelines within the company, and regularly inspect and maintain the equipment to keep it in good running condition.
4, to participate in regular safety inspection, the problems existing in the production equipment, electrical appliances, formulate corrective measures, implement the responsible person, rectification within a time limit.
3, strictly carry out hot work, electric welding, electricity safety, shall not be illegal operation, illegal command.
5. Organize the formulation of equipment maintenance management system and safety operation procedures, and be responsible for supervising the implementation.
6. Ensure that the safety protection devices of production equipment are complete and effective. After the installation, repair and relocation of mechanical equipment, it is necessary to re-check whether the safety protection devices are complete and effective before the handover operation.
7, to ensure the safety of maintenance work, preventive measures in place and verification, shall not appear preventive measures are not implemented and unauthorized operation lead to safety accidents.
8. Complete other temporary safety work arranged by the company.
Third, evaluation
If the safety production target is not completed, it shall be assessed according to the company's safety management assessment standards; If it causes serious consequences and constitutes a crime, it shall be given corresponding administrative sanctions and handed over to judicial organs for handling.
Four. supplementary terms
1. This responsibility letter is valid for one year, namely: 20xx 65438+ 10/to 20 1 5 65438+February 3 1.
2. This responsibility letter is made in duplicate, with each party holding one copy.
Signature of Party A (deputy general manager in charge of safety):
Signature of Party B (Equipment Management):
date month year
Equipment Installation Safety Responsibility Letter 4 Party A: (hereinafter referred to as Party A)
Party B: (hereinafter referred to as Party B)
In order to conscientiously do a good job in the equipment installation of this project, and complete the equipment installation on time with good quality and quantity under the condition of ensuring safe construction, and in accordance with the relevant national laws and regulations, and in order to clarify the responsibilities, rights and interests of both parties, this responsibility letter is hereby signed by both parties through consultation:
Comrade in charge: project engineering equipment
During the installation, the person in charge, on behalf of the unit (Party A), will be fully responsible for the related technologies, progress, site management, quality, safety and cost control of the equipment installation of this project.
First, the installation responsibility
When installing the project equipment, Party B must abide by the corresponding national construction specifications and safety operation procedures, and be responsible for the installation of the project equipment. Party B shall work out a feasible construction plan according to the scale, characteristics and actual situation of the project, and report it to the technical department of Party A and the higher authorities for approval and filing. Party B must complete the installation of project equipment on time, with good quality and quantity according to the approved construction plan and design.
Second, the quality responsibility
1. Party B must carry out the construction according to the requirements of the construction plan, abide by the national laws and regulations, conscientiously implement the relevant national mandatory regulations, and shall not cut corners or lower the quality standards during the construction process, and must ensure the construction quality. In case of quality accidents, Party B shall bear corresponding responsibilities.
2. In the process of construction, Party B must purchase and use materials with product certificates and passed the re-inspection to prevent the use of unqualified products and materials. If losses are caused by the use of unqualified products, Party B shall be responsible, and Party A will punish Party B as appropriate.
3. Party B must establish and improve the quality management system internally, formulate the quality management responsibility system, clarify the quality responsibilities of the technicians, full-time quality inspectors and team leaders in charge of quality management on site, and earnestly implement the "three inspections" such as team self-inspection, mutual inspection and sampling inspection by full-time quality inspectors to ensure the construction quality.
4. Party B shall take the initiative to accept and cooperate with Party A's quality inspection and management of the construction site, take the initiative to accept the inspection by the higher authorities, and make serious rectification in time according to the rectification opinions and rationalization suggestions put forward during the inspection.
5. Party B must strengthen the quality management of construction projects. If unqualified processes and parts are found during inspection and acceptance, Party B must seriously organize rework or redo until they are qualified. Party B must ensure that the one-time delivery is qualified.
Third, the safety responsibility
1. Party B must attach great importance to safe construction, and conscientiously implement the relevant national laws and regulations on equipment construction safety management and Party A's safety production management system. The person in charge is responsible for the safe construction of equipment installation in this project, and must bear corresponding responsibilities in case of safety accidents.
2. Party B must work out the construction plan according to the relevant regulations and requirements, and according to the location, characteristics and construction scale of the surrounding environment of this project, and carefully organize the implementation after being signed and approved by relevant departments and personnel. Put an end to illegal command and operation to ensure safe operation. In this regard, Party A shall actively cooperate with and guide Party B to do a good job.
3. In the process of construction, Party B shall carefully organize daily self-inspection, eliminate potential safety hazards in time when found, and stop illegal command or operation in time when found.
4. Party B shall consciously accept and actively cooperate with the special safety inspection organized by Party A and the superior departments, and timely rectify and eliminate the problems and hidden dangers found in the inspection.
5. Party B shall appoint a full-time fire controller to do a good job in fire safety management at the construction site.
Fourth, the civilized construction responsibility
1. Party B shall do a good job in civilized construction management on the construction site according to relevant requirements, so as to ensure that materials are neatly stacked, roads are smooth, and the site is clean and sanitary.
2. Party B shall set up temporary facilities at the site according to the requirements of the layout of the construction site, and put them into use after acceptance.
3. Party B shall consciously accept the inspection by Party A and the superior departments, seriously correct the problems raised in the inspection, and ensure civilized construction management.
Verb (abbreviation of verb) time limit for a project responsibility
1. Party B must complete all the construction contents of the project within the time limit agreed by Party A, and deliver them to use on schedule.
2. When the project quantity changes or due to irresistible factors, it is necessary to increase the construction period. Party B shall apply to Party A for extending the construction period in time.
Economic responsibility of intransitive verbs
1. Quality accidents, safety accidents, delayed delivery, economic disputes, labor disputes, penalties for violation of regulations, etc. The person in charge of Party B shall bear 70% of the economic losses, and the vice president of the company to which the person in charge of Party B belongs shall bear 30%.
2. If the actual expenditure exceeds the company's budget after project settlement and is caused by force majeure, the person in charge of Party B shall apply to the company for sharing the expenditure caused by force majeure; For company factors (such as the price increase of purchased materials), the premium part of expenditure is divided separately; If it is due to Party B, the responsible person of Party B will be punished according to the proportion of cost overruns:
(1) If the project overrun is less than%, the person in charge of Party B shall be fined RMB; (2) If the project cost overruns are more than% but less than%, the responsible person of Party B shall be fined RMB; (3) If the project cost overruns are more than% but less than%, the responsible person of Party B shall be fined RMB; (4) If the project cost exceeds%, the responsible person of Party B shall be fined RMB and dismissed.
3. In case of serious accident in the project and violation of criminal law, the corresponding personnel of Party B shall bear corresponding criminal responsibilities.
Seven. Scope of power
1. The person in charge of Party B has full authority to allocate the equipment and personnel (within the company) required for the equipment installation of this project, and Party A shall give strong support;
2. The person in charge of Party B has the right to select the winning team for the engineering team participating in the project bidding;
3. If the project needs to lease equipment, vehicles or others, and the expenditure is less than RMB, the person in charge of Party B may decide on his own;
4. If the project needs external labor, and the cost is lower than RMB, the person in charge of Party B can decide for himself.
VIII. Economic Incentives
1. If the project is successfully completed and accepted and delivered on time without any accidents or disputes, the company will reward the responsible person of Party B with a liability allowance of RMB;
2. If the actual expenditure after the settlement of this project is lower than the company's budget, the company will reward the person in charge of Party B according to% of the saved amount;
This Responsibility Letter is made in duplicate, one for Party A and one for Party B, which shall come into effect after being signed by both parties, and shall be terminated naturally after the project is completed and accepted.
Party A: (Seal) Legal Representative: (Signature or Seal)
Party B: (signature) ID number:
date month year
Equipment Installation Safety Responsibility Letter 5 Party A: (hereinafter referred to as Party A)
Party B: (hereinafter referred to as Party B)
1, responsible for the management of the main engine pump room and equipment, check the running status of the pump room equipment at any time, prohibit irrelevant personnel from entering, and ensure the normal operation of the air conditioner.
2. Responsible for the regular inspection of the computer room to prevent animals and sundries from falling into the electrical cabinet, causing major events such as electrical short circuit. The doors of all power distribution cabinets must be locked.
3. Be responsible for keeping the computer room clean, free of rubbish and sundries, and ensuring that the equipment and ground are dust-free, oil-free and pollution-free.
4. Be responsible for providing sufficient fire-fighting equipment in the computer room as required, and mark the direction of the water supply pipeline with special paint *.
5, responsible for equipment use ledger, indicate the number, name, service life and maintenance.
6, responsible for air conditioning operation technical index inspection, and make records. Check the door, window, wall, floor, lighting, unit and water pump equipment in turn, and check whether the supporting facilities are in good condition, operating normally and without noise. Collect the operating voltage, current, water supply pressure and other instruments of the pump on time.
4, responsible for the normal maintenance of equipment, found that the fault timely report to the leadership. If you can solve it yourself, solve it yourself. If it cannot be solved, the maintenance unit (Weifang Yeling Air Conditioning Maintenance Company) will be informed in time.
5. Be responsible for turning on the air conditioner as required. Pay close attention to the running state of the equipment after it is started, so as to deal with it in time and nip in the bud.
Party A: (Seal) Legal Representative: (Signature or Seal)
Party B: (signature) ID number:
date month year
;