Company fire safety evacuation drill plan

Fire safety evacuation exercise scheme of Jindun Electronic Industry Co., Ltd.

I. Purpose of this work

In order to make employees evacuate from the accident site in an orderly, timely and effective manner, reduce and avoid injury accidents, and cultivate employees' self-protection ability, fire safety evacuation drills are specially held.

Second, the exercise leading group

General Finger Wave: Dong Sheng

Deputy Commander: Yu Jianfeng? Fang yongda

Evacuation Command Group: Shen Qi, Wu Xiang and Xie Weifeng.

Order Guidance and Protection Group: Xia Jingkun, Yuan Gang and Lu Bo

Medical rescue group: Huang Juan Chen Liang Zhao Jianju Zhang Tiaofen.

Logistics Support Group: Zhu Aiyun, Chen Weiqiang and Li Mei.

Distribution Group: Zhu Wenyan

Emergency team: Zhang.

Prevention group: Zhan Xingang, Yuan, Kong Ming

Third, the alarm procedure:

1. Xu Fengli in the office immediately reported to the fire center by phone or mobile phone (phone number 1 19), and the report content was: "There is a disaster in Jindun Electronics, please come to the rescue quickly", and the other party hung up after asking. Fang Yongda is responsible for asking 120 for help and reporting the situation to the development zone leaders.

The guard on duty is responsible for opening the factory gate, and then waiting at the intersection to guide the fire-fighting vehicles. Shen Qi is responsible for checking the fire escape of the evacuated factory building; When necessary, Zhan Xingang is responsible for turning off the company's main power supply.

Fourth, the drill arrangement

1, ready

A, make employees familiar with emergency hedging methods.

B, make employees familiar with emergency evacuation routes and centralized locations.

C, factory employees to conduct emergency evacuation drills.

2. Participants: All employees

3. Drill scenario: A fire broke out in the production building 1.

4. Practice content:

The exercise includes emergency avoidance and evacuation. In case of fire, gather at the scheduled place quickly to prevent disaster.

5, alarm signal:

The disaster begins with a broadcast alarm. Continuous alarm sounds represent fire and employees are evacuated. After hearing the siren, drill according to the predetermined plan, requiring the whole process to be completed within 3 minutes.

Verb (abbreviation for verb) the location and route of evacuation.

1, concentrated place: factory basketball court;

2. Evacuation route.

① Aisle: employees of warehouse and quality assurance department go from the east gate to the basketball court.

② Access: The producers on the fourth floor go to the basketball court via the west stairs;

③ Access: The producers on the third floor go to the basketball court via the east stairs;

④ Access: employees of SMD workshop on the first floor go to the basketball court through the north access.

⑤ Access: Employees of the technical department on the second floor go to the basketball court via the south stairs.

Intransitive verbs Employee responsibilities

1, all employees must obey the arrangement of the company (www..Com) to ensure the effectiveness of safety publicity and education activities. Before the drill begins, someone should be responsible for every staircase and every corner of the evacuation route.

2. Division of responsibilities (the team leader is responsible for the specific arrangement of personnel in the team)

(1), once the disaster happens, Xu Summit in the office immediately reports to Dong Sheng, the chief commander and vice president.

(2) Commander Dong Sheng decided to start the emergency evacuation plan after verifying the situation. Order Yu Jianfeng, deputy commander? Fang Yongda immediately arrived at the scene to command, and Zhu Yake issued an alarm signal, demanding that all workshops stop working and evacuate safely in two orderly columns under the command of the team leader.

(3) Evacuation (evacuation) method: The team leader at that time quickly instructed the employees to open the front and rear doors in time, organized the employees to queue up, and divided the employees into two groups indoors. After evacuation, lead employees to evacuate downstairs in two orderly rows as required. Which side should the stairs be evacuated according to the regulations; The workshop director who was working in the office at that time immediately went to the workshop staff such as Loudaokou, the nearest office. After meeting the workshop staff, he immediately cooperated with the team leader to lead the workshop staff to the basketball court to assemble the team (if necessary, follow the leader to evacuate to the safety zone outside the factory).

(4) Order guidance and protection group: After hearing the alarm, they immediately arrive at their respective positions and do a good job in evacuation guidance and protection.

(5) Evacuation command group: responsible for directing and coordinating the team leaders of each channel to safely transfer employees to the basketball court for assembly.

(6) Medical rescue team: After receiving the notice from the office, gather at the factory gate and stand by and prepare rescue equipment. Provide psychological counseling to employees who are frightened and have psychological obstacles.

A, ambulance personnel take the first-aid medicine box to the basketball court for standby, and deal with the sick and wounded in time.

B, employees of various functional departments are on standby at the basketball court, and seriously injured employees are sent to the hospital in time.

(7) Logistics Support Group: prepare megaphones, fire extinguishers, towels and drinking water. , and receive and deliver the required materials.

(8) Communication group: send an alarm signal to instruct employees to queue up in order under the command of the team leader, evacuate the workshop in an orderly manner, cover their nose and mouth with a low posture, and evacuate in the corridor and stairs in order.

(9) Emergency group: it is a mobile group, which is on standby at any time.

(10), fire brigade: responsible for fire fighting demonstration.

(1 1), workshop director, responsible for his own workshop; Yu Jianfeng is responsible for assembling employees in the basketball court; Zhao Xiaoqian is in charge of accident handling.

(12). When employees arrive at the basketball court, they will assemble according to the workshop. The workshop director counts the number of people (the number of people who should have arrived and the number of people who actually arrived) and sends the disaster information to the deputy commander Yongda. Yu Jianfeng, the deputy commander, timed the drill with a stopwatch from the beginning, and grasped the exact time of the whole drill.

Seven, evacuation requirements and matters needing attention:

1. After hearing the alarm, the employees of the whole factory immediately evacuated safely and quickly, so they can't pack any more things. The cat bends down and covers its nose and mouth with towels, clothes, cuffs, etc. And evacuate quickly. )

2. Evacuation sequence:

(1) When evacuating from the workshop, the workshop director divides the employees into two parts with roughly the same number in advance. After hearing the evacuation order, all personnel immediately stood up and evacuated in turn as required.

② Evacuation: Take the workshop as a unit, and proceed in the order of first floor and then high floor.

(3) Employees are arranged in two rows in the corridor and evacuated in groups as planned.

3. Preventive measures

① When evacuating, employees on the second, third and fourth floors go downstairs in turn. It is required to go downstairs quickly and safely in turn, and it is not allowed to crowd first, so as to avoid crowding and trampling accidents.

(2) The floor guide personnel should issue evacuation instructions to the next group of personnel after the evacuation of the previous group of personnel, and control the reasonable density without interval to prevent the corridor and stairs from being crowded.

Eight, the end of the drill

At the end of the drill, the chief commander Dong Sheng commented. Afterwards, the workshop director should sum up in time, write out his experience, hold a theme meeting, and constantly improve the self-help and self-protection ability of employees in emergency avoidance.